My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC28800
DRMS
>
Back File Migration
>
Inspection
>
INSPEC28800
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:32:12 PM
Creation date
11/18/2007 10:17:57 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981044
IBM Index Class Name
Inspection
Doc Date
2/25/1994
Doc Name
STOCKPILE MANAGEMENT PLAN
From
CYPRUS EMPIRE CORP
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
- i <br />c~ <br />~ Smp nCorporation <br />February 25, 1994 <br />Janet sinne <br />Envirorunantal Protection specialist. <br />Division of Minerals and Geology <br />Office of Mined Lnnd Reclamation <br />1313 Sherman Street Room 215 <br />Denver, Colorado 80203 <br />RS: Stockpile Management Plan <br />Dear Ms. Binna: <br />FEB 25'94 11 55 No.005 P.O1 <br />• III IIIIIIIIIIIII III <br />P.o. 8ox ee <br />Crelp, Colorado 61626 <br />303.8246246 <br />I thank you !or your prompt attention to Cyprus Empires (Empire) <br />request to work on its stockpile to remove some hot spots. The <br />work involved cutting a road around the toe o! the existing <br />stockpile eo that the hot coal could be removed and taken to a <br />storage area immediately south of the stockpile. During this <br />process a portion oP ditch 5-D1 was Pilled in and it will be <br />cleaned out as soon as the road is no longer required. Presently, <br />the ditch has seen minimal disturbance and can be repaired <br />immediately with the use of a backhoe. The amount of coal placed <br />in the ditch was lase than I described to you over the phone. I do <br />not believe that placing oP coal in the ditch will result in any <br />environmental problems. The loader did have to drive through a <br />portion of the ditch adjacent to the overland belt, and this area <br />will be dressed up within the next day or two. Straw bales will be <br />placed downstream of where the ditch was driven through to minimize <br />any impacts. I believe this will take care of any short term <br />concerns. <br />Empire anticipates that it may be necessary to use this road over <br />the next 30 days in the event additional hot spots may be <br />encountered. However, during the interim period when the road is <br />not needed, the ditch will be reestablished so that it can function <br />as designed. If additional hot coal is removed from the stockpile. <br />1t will be placed in the above referenced storage area. In the <br />event that additional room is needed the SAE to the south of the <br />stockpile will be utilized. Access to this site viii be gained by <br />bladinq a ramp down to it from the existing storage area. <br />Hopefully, this site will not be needed. <br />
The URL can be used to link to this page
Your browser does not support the video tag.