Laserfiche WebLink
iii iiiiuiiniiiiii <br />COAL BOND COMPLIANCE INSPECTION FORM <br />Mine,~~ 1"~~wc. Permittee ~~,~,,,~ ~~ ~ , <br />Permit No. ~~$ ~- pa I Operator _~_ 2 <br />Date ~/.~9 /9 ~ Inspector ~r,,,,Q-~71 V~ <br />Part 1 -Contemporaneous Reclamation - To be completed at least annually <br />Backfilling and Grading <br />Compare the following field conditions to approved plans using the reclamation cost estimate, <br />mine plan operations plan maps, post-mining topography maps, and maps from annual reclama- <br />tion reports, etc. Write a brief description of any observed discrepancies. <br />I. Number of open pits, portals, mine shafts, and/or adits. ~_ het n.;~ ~~ ~~ _ <br />baJL~; I1 a.,,.~ ~.r~lA,;,~ w~.; K .v~ <~fe1~.; i~ .r l' ~.~ <br />bo,-.d- f~.ea~,.~ 'i..i~_~j' Cp~~ rw~.~l .-~...~ -W.a ~ -Y <br />l.a. Approximate dimensions of pits/openings. 5' ~ i0 f 30 ~ s~ <br />'v~ / <br />2. Number of spoil ridges at each pit, or time elapsed since the pit was last active. N l~ <br />3. Are there existing subsidence features that require backfilling and grading? ~~ <br />4. List refuse areas and their locations. ~~- <br />