My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC28647
DRMS
>
Back File Migration
>
Inspection
>
INSPEC28647
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:32:05 PM
Creation date
11/18/2007 10:17:15 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981021
IBM Index Class Name
Inspection
Doc Date
6/9/1982
Doc Name
BOURG STRIP 06/1982 INSPECTION
From
MLR
To
FLATIRON CO
Inspection Date
6/3/1982
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Eli' !i <br />:S. Compliance with Colorado Surface CoaZ~~7ivng ReclamEation d <br />CRS 2973, as amended 34-33-101, et. sea., <br />and the <br />Rules <br />This includes a listing of the particular provisions of the regulatory arc <br />examined during the course of this inspection, and identifies enforcement a <br />during the inspection for failure.to comply with the Rules and P.egulatiaAS, <br />the pezait. <br />4.02 Signs and Markers <br />All signs and markers were in place and in good condition. <br />4.03 Roads <br />Roads at the mine site were in good surface condition. Sparse veget tivi <br />growth was noted 'in the areas adjacent to the haul road seeded last fall. +1 , <br />roadside ditches and culverts were open. <br />4.04 Support Facilities <br />:+ere <br />The small impoundment of water noted adjacent to the truck scale fac~i~iF: <br />during the May inspection no longer exists. No problems were noted with t~t{{e 54 port <br />facilities. ~ <br />4.05 Hydrologic Balance <br />All ponds and ditches at the mine site were free of water with the xcep~ion <br />that a small amount of water remains in Pond C. The operator has temporar l~ S~lspended <br />construction work on Pond C due to the wet conditions in the pond bottom. T e' Aerator <br />believes thak the pond will be completed by July 1, 1982 compliance deadli. e <br />The ditch from above Pond~C to Sump D will be constructed after top <br />operations are complete. <br />Very 'little vegetative growth was noted in the ditches and on the <br />4.06 Topsoil <br />Topsq'il stripping was temporarily suspended due to equipment failur <br />examination of the stripping cuts it appears that the operator is salvagin <br />from the area. Topsoil Stockpile A has a good stand of young vegetation v' <br />the surface of about one half of the pile. The other half of the pile con <br />new topsoil placed on it. This pile should be in its permanent configurat~ <br />fall and ready for seeding of the entire surface. <br />4.14 Backfilling and Grading <br />Backfilling operations are continuing in the Stage 1 cut. This a <br />ready for topsoil and seeding this fall. <br />4.15 Reve tation <br />Some success was noted in all of the areal seeded last fall. ;All <br />should be m nitor~d throughout the summer for success and persistene . <br />t' I I ~ I YII <br />1 1 tripping <br />el bankments. <br />F om <br />11 topsoil <br />ibll on <br />nue to have <br />iri b this <br />~ l d be <br />shou <br />.; <br />' se areas <br />~} <br />It ' l i <br />I <br />
The URL can be used to link to this page
Your browser does not support the video tag.