Laserfiche WebLink
{Page 2~ <br />MINE ID # OR PROSPECTING ID #: nn-t 9~3-00~~~ <br />INSPECTION DATE: 5-~5-ns INSPECTOR=S INITIALS: inn <br />This was apre-operation inspection only for the purpose of conducting a field review of the area Continental Materials Corporation <br />proposes to add to [he permit by Amendment No. 2. Mazk Heffner, of Southwestern Ecological Services, met me at the mine and <br />accompanied me during the inspection. There was not enough time available to inspect the entire permit area. <br />The last complete inspection of the perrnit azea by the Division was in October of 2000. Problems identified during that inspection <br />were subsequently abated. The permit area is due for a complete inspection, which should be completed some time during the present <br />program year. The bond was reviewed at the time of the last inspection and updated as to the required amount. <br />The entire 62 acre area planned for addition was observed from high ground on the west side of the proposed amendment area. The <br />site is a portion of what was formerly Little Johnson Reservoir. The dam appears to have been breeched and the reservoir area has not <br />been used for water storage for many years. The entire site has established to a good stand of grasses with a few aeeas of shrubs and <br />trees. There are some wetland areas on and adjacent to the site. The amendment's mining plan avoids disturbing the wetland areas. <br />The proposed amendment area adjoins the east side of the present Phase 4e area and will be mined as an extension of the phase. It is <br />apparent from field observation that the mining and reclamation plans proposed in the amendment have been carefully prepared to <br />account for and prevent any potential negative impacts to structures, groundwater and wetland areas on and near the site. <br />The inspector did not identify, by this field observation, any site issues that were not already addressed in the amendment application <br />I & E Contact Address <br />NAME: Pete Melcher <br />OPERATOR: Transit Mix Concrete <br />STREET: P_ (~ Rnx 1030 <br />CITY/STATE/ZIP: Cnlnrnrin Sl1rin~s, Cr7 R09n1-103n <br />Cc: Harry Posey- DMG via e-mail <br />Mark Heffner- S. E. S. <br />