My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC28357
DRMS
>
Back File Migration
>
Inspection
>
INSPEC28357
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:31:52 PM
Creation date
11/18/2007 10:15:52 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981038
IBM Index Class Name
Inspection
Doc Name
INSPECTION REPORT
Inspection Date
1/27/1998
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bdow aro eomme~s oa ffie Mspxtloa 11~e coavaads laclude Qiacusaloa of o6swatlons made dudag ffie laapectloa. <br />Comments also dearnbe aay enforcement utioas talcea dunng the aspecfion aad the title or evidence wppoNag the <br />enLorcanent actloa <br />This aerial inspection was flown on January 27, 1998. The aerial photograph was reviewed <br />on February 3, 199$. h*o problems had been observed during the flight. <br />Snow cover was variable azound the mine site. The West A4ine was snow covered wrote the <br />highway loadout and stockpile areas were largely free of snow. The main mine site facilities <br />azeas were only partially snow covered. The area around ponds 1 through 4 was snow <br />covered. <br />Ponds 1, 2, 3, 4, the West Ridge waste pile pond and the West Portal pond were all snow <br />covered. The highway stockpile pond was ice covered. No problems were observed with <br />embankments or spillways. No discharges were evident. <br />The mine is not operating at the present time. Bowie No. 1 coal has been stockpiled at the <br />highway stockpile, at the highway loadout and on the crusherlscreenerbenth. Only some <br />snow was on the crusher~screener bench. Essentially, there was no snow cover on the <br />highway coal stockpiles. The loadout is also being used to ship coal from Bowie No. 2. No <br />problems with fugitive dust or coal going offsite were observed. No problems with bench <br />stability were observed. <br />The main haul road and the access mad to fire office bench were clear and passable. Light <br />use roads were snow covered. No problems with road cut and Sll slope stability were seen. <br />F 1~':-tG <br />
The URL can be used to link to this page
Your browser does not support the video tag.