My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC28305
DRMS
>
Back File Migration
>
Inspection
>
INSPEC28305
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:31:51 PM
Creation date
11/18/2007 10:15:38 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981047
IBM Index Class Name
Inspection
Doc Date
9/6/1984
Doc Name
BLUE RIBBON AUGUST 30 1984 INSPECIT NFN C-047-81
From
MLRD
To
BLUE RIBBON COAL CO
Inspection Date
8/30/1984
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Richard D. Lamm <br />Governor <br />Operation <br />File No.: <br /> <br />DEPARTMENT OF NATURAL RESOURCES <br />David H. Getches, Executive Director <br />MINED LAND RECLAMATION DI\ <br />DAVID C..SHELTON, Director <br />COAL INSPECTION REPORT <br />BLUE RIBBON <br />C-047-81 <br />Operator Name: Blue Ribbon Coal Company <br />Permittee Name: Same <br />Address: P.O. Box 58 <br />Delta, Colorado 81416 <br />County: Delta <br />Inspection Date: August 30, 1984 <br />Type of Operation: Underground, Federal <br />Inspector: Michael Long <br />Weather: Sunny and warm <br />Time: A.M. & P.M. <br />Type of Inspection: Partial <br />Operator Contact: Don Brown <br />~~ <br /> <br />I. General Cononents <br />1. The mine bench stabilization analysis has been completed by the operator's <br />consultants. The operator in in the process of evaluating alternatives <br />suggested to stablize the bench. A total of six monitoring wells were <br />established on the bench, along the outslope and along the toe of the bench to <br />determine water levels. <br />2. The operator is continuing work to route surface water around the bench. <br />3. The operator has been handpicking coal along Hubbard Creek. No major <br />reclamation work has begun yet. <br />4. Additional riprap has been placed along the outer bank of the large pond <br />above Hubbard Creek crossing. <br />5. Approximately 95% of the coal along Hubbard Creek in the area adjacent to <br />the Deer Trail Headgate has been handpicked and piled for future pick-up. The <br />operator has done a good job in this area. <br />423 Centennial Building, 1313 Sherman Street Denver, Colorado 80203 Tel. (30'x) 866-3567 <br />
The URL can be used to link to this page
Your browser does not support the video tag.