My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC27979
DRMS
>
Back File Migration
>
Inspection
>
INSPEC27979
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:31:34 PM
Creation date
11/18/2007 10:13:45 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977361
IBM Index Class Name
Inspection
Doc Date
10/16/1997
Doc Name
SILICA QUARRY PN M-1977-361 RECLAMATION PLAN & COST
From
DMG
To
SOUTHDOWN INC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
,. <br />RECLAMATIO• T SUMMARY cone d • heel 4 of 4 <br />~ Cost (SI <br />Subtotal (K1: <br />K. PORTAL/SHAFT SEALING <br />cask No.~ <br />__________________________ <br />L. DRILL HOLE/MONITORING WELL SEALING <br />Task No.~ Task Description <br />_____________________________________________ <br />Subtotal lLl: <br />M. MISCELLANEOUS RECLAMATION TASKS <br />Task No.~ Task Description ~ Coat (S1 <br />________I______________________________________________________________ <br />Demolition ~ <br />5 ~ Seeding revegetate 6.34 acres to rangeland ~ 57,514 <br />~ Panting ~ <br />______6_I Mob/Demob ,{ %Cf~l _____S L,B75 <br />Subtotal (M): $5,389 <br />Task Description <br />~ COet 151 <br />______________I ____________ <br />TOTAL DIRECT RECLAMATION COSTS Isubtocals A through M1: $17,768 <br />II. INDIRECT COSTS <br />A. CONT77AC[OR'S OVERHEAD fi PROFIT <br />Stem No.~ Item Description <br />________I_________________________________ <br />1. ~ Public Liability Insurance..... <br />2. ~ Contractor's PerEOrnance Bond <br />1. ~ Contractor's Profit........... <br />4. ~ Job Superintendent.. <br />__________________________________________ <br />CosC ($) <br />_______________I____________ <br />1.5504 of dir. ~ $275 <br />0.9754 of dir. ~ $173 <br />10.004 of dir. ~ $1,777 <br />Subtotal (A1: $2,225 <br />TOTAL CONSTRUCTION CONTRACT AMOUNT (direct plus 0 fi P):• $19,993 <br />B. DMG PROJECT ADMINIETRAT ION E%PENS ES <br />Item No.~ Item Description ~ Cost (S1 <br />________I______________________________________________________________ <br />1. ~ Minerals Program Admin. Fee at 5.004 of cnt r.~ 51.000 <br />________________________________________________________________________ <br />NET INDIRECT COST PERCENTAGE: 18.1Sk Subtotal (B): $1,000 <br />TOTAL IND IRECf RECLAMATION COSTS (subcota is A through B1: 53,225 <br />TOTAL PERFORMARCE BOND AMOUM Idirecc plus indrrect coats): $20,993 <br />
The URL can be used to link to this page
Your browser does not support the video tag.