My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC27904
DRMS
>
Back File Migration
>
Inspection
>
INSPEC27904
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:31:30 PM
Creation date
11/18/2007 10:13:20 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977311
IBM Index Class Name
Inspection
Doc Name
Inspection Report
From
DMG
To
Cotter Corporation
Inspection Date
5/29/2003
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Date : 02-Jun-2003 Permit or job no. <br />User: WHE Abbreviation <br />Filename <br />Agency or organization name :DMG <br />M-1977-311 <br />none <br />M311-000 <br />Site : Sr-13A Mine <br />State :Colorado <br />County :San Miguel <br />Permit orjob action :SR-Ol <br />TASK LIST (DIRECT COSTS) FORM FLEET TASK DIRECT <br />NO. TASK DESCRIPTION USED SIZE HOURS COST <br /> <br />001 -Revegetate 4 acres affected lands revege 1 5.0 $3,502 <br /> <br />002 -Haul reclamation equipment to and from job site mobilize 1 5.0 $1,079 <br />includes inFlation factor adjustment of <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT <br />NA <br />Liability insurance <br />Performance bond <br />Job superintendent <br />Profit <br />SUBTOTALS : 70.D <br />% TOTAL DIRECT COST' <br />1.55 <br />1.05 <br />NA` <br />10.00 <br />of direct <br />of direct <br />NA NA <br />of direct <br />total = $71 <br />total = $48 <br />total = NA <br />total = $458 <br />'not required (or eqp. operetor serves as super.) TOTAL O & P = $$77 <br />LEGAL • ENGINEERING -PROJECT MANAGEMENT • CONTRACT AMOUNT (direct+ O 8 P) _ $5,158 <br />Financial warranty processing (legal/related costs) : 0.00 total $ NA total = $0 <br />Engineering work and/or contracUbid preparation : NA NA NA total = NA <br />Reclamation management and/or administration : 5.00 % of cntr. NA total = $258 <br />CONTINGENCY- NA' NA total= NA <br />'contingencies accounted for a[task level TOTAL INDIRECT COST= $$35 <br /> TOTAL BOND AMOUNT (direct + indirect) _ $5,416 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.