Doc Date
5/1/1996
Doc Name
COAL INSPECTION REPORT
Inspection Date
4/24/1996
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
III. COMMENTS -COMPLIANCE <br />Below are comments on the inspection. The comments include discussion of observations made <br />during the inspection. Comments also describe any enforcement actions taken during the <br />inspection and the facts or evidence supporting the enforcement action. <br />This was a complete inspection of the Carbon Junction Mine for the month of April, 1995 <br />The containment berm around the topsoil stockpile adjacent to Pond #1 has been built up to <br />provide adequate containment where the berm was settling. It appears that positive drainage <br />from the contained area to Pond #1 has been provided for by means of a gap in the berm which <br />opens directly into the pond. <br />All hazardous materials have been move within proper bermed spill containment areas. <br />All ditches and ponds were inspected and found to be in compliance. All culverts were clear <br />and capable of functioning as designed. <br />Spoil material was being deposited on the fill area during the inspection. The operator must <br />insure that the underdrain is not covered with fine clay material which may ultimately fill and <br />clog the underdrain. Oakridge Energy has retained the services of Savage & Savage to assist <br />Goff Engineering with the design of the diversions for the fill area. It is expected to take until <br />late summer to complete designs and construct the diversions, if ultimately required. <br />Records were inspected and found to be in compliance. See page 5 of this report for further <br />details. <br />