Laserfiche WebLink
10. COMYEN1f - COMILIANCE <br />BdoworooomnardaonlAstupsclb~. nroormrMs-,eludsdtcuobnace..Mrnlon.moasa.-,om.r~.eXon cp,rrw,a <br />oho dsto6e any siarownrd acNorn tdan dutp 1M Y~.ilon and Me laeb d eridenos aippatYip tlr wAoioarnerd ac0on <br />Cary-0vor 11om~ of oonoom from provbuo Irupoof{orn: Novo <br />fits aerial irrspecllon report f3 prepared by Byron G. Walker from eight aerial photographs <br />(numbers 14-01-07-16-1 1Fxaugh 8) on Ella at the Divbion. The photographs were taken on Juy 16, <br />2001 by, and an oral debriefing was obtained from, Mr. Harty Ranney, Environmental Protection <br />Specialist of the Division. fits was a scheduled aerial inspection. <br />HYDROLOGIC BALANCE There were rw apparent hydrologk: babnce issues identified in the <br />photograph a the debriefing of Mr. Ranney. Staring water is observed in the ponds of the <br />fadlHbs areo in Photograph19-01-07-16-7. <br />BACKFILL AND GRADING Backcasflng by drogline in the Section 16 Pit fa shown on plctt~res 19-01- <br />07-16-1, 4 and 5. Ungraded backfilled areas of Section 16 Pit appear in photograph 19-01-07-16- <br />1, 2 and 3. The West Pit Fill appears in photograph 19-01-07-16-6. <br />SUPPORT FACILf11FS Office and maintenance facilities are shown on pichae 19-01-07-16-7, along <br />wflh the primary crusher site.lhe Gossard Loadout facilities are shown on pictue 19-01-07-16~. <br />GENERAL MINE PLAN COMPLIANCE Operations observed ore in compliance with the general <br />mine plan. Openpff mining operoflons are well 1luslrated in picture 19-01-07-165 (West Pit), from <br />clearing and gn~bbing, topsol removal, benching, floor operations, to backcasting, and hock <br />backflll. <br />Pops ~ of ~ Paget, Dafe _91 July 2001 . Inirlak <br />