Laserfiche WebLink
III. COMMENTS -COMPLIANCE <br />Below are comments on the inspection. The comments include discussion of observations made during <br />the inspection. Comments also describe any enforcement actions taken during the inspection and the <br />facts or evidence supporting the enforcement action <br />This was a complete inspection of the Carbon Junction Mine for the month of March, 2004 <br />Availability of Records: The records were satisfactory. see page 5 of this report for details. <br />HydroloStic Balance: All ditches, culverts and ponds were inspected. Both ponds were dry, appeared <br />stable and were not discharging. All culverts were clear and capable of functioning as designed <br />General Mine Comaliance: The site has finished reclamation m the south pit area and has completed a <br />large portion of the permanent diversion of Carbon Junction canyon's drainage. Minor maintenance on <br />the road leading to the north pit is warranted Topsoil has been stripped back of the fill area for further <br />reclamation. (see photo) <br />