My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC27671
DRMS
>
Back File Migration
>
Inspection
>
INSPEC27671
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:31:19 PM
Creation date
11/18/2007 10:12:09 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1994082
IBM Index Class Name
Inspection
Doc Name
Inspection Report
Inspection Date
9/7/2005
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
III. COMMENTS -COMPLIANCE <br />Below are comments on the inspection. The comments include discussion of observations <br />made during the inspection. Comments also describe ony enforcement actions taken during <br />the inspection and the facts or evidence supporting the enforcement action. <br />Thii was ~ Uartial ~n5~~'Ciian ~` inC' "oast mir@ sih~. Tne W@ather wac dBar pna warm. Rov <br />Caro accon ipan:ed me on me entire :nspecrian. <br />Grading. topso~l~ng and seeding are progressing well. Grading and topsoiling are completed in the <br />scraper pit A dozer was working on the slope above Pond 12. A small dozer was creating dozer <br />banns on the steep slope east of Pond 13 See picture on left below Four scrapers were spreading <br />topsoil on the recently graded areas of the Valora pit. According to Roy, over 70 acres have been <br />seeded so far at the Yoast Mine <br />I walked the drainage between Pond 11A and Pond 11 to observe repairs that Seneca has undertaken <br />this year Pond 11A was not discharging. Additional riprap has been placed in the the channel below <br />the Pond 11A discharge pipe. A number of rock check dams have been repaired/installed where <br />erosion occurred this spring. These rock check dams, combined with Pond 11A and continued <br />revegetation establishment above should help control further erosion rn the channel. The water level <br />in Pond 11 was several feet below the primary spillway <br />A number of thistle patches were observed along the banks of this drainage. Seneca plans to have a <br />weed spraying crew at Yoast soon and these patches need to be included ~n the weed control eNorts, <br />A drainage channel was recently completed and lined with riprap in the northern neck pit area on the <br />east side of the road. See picture on right below. <br />
The URL can be used to link to this page
Your browser does not support the video tag.