My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC27547
DRMS
>
Back File Migration
>
Inspection
>
INSPEC27547
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:31:13 PM
Creation date
11/18/2007 10:11:21 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1979195
IBM Index Class Name
Inspection
Doc Date
3/28/2001
Doc Name
COST SUMMARY FORM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
w <br />PROJECT IDENTIFICATION <br />CIR III IIIIIIIIIIIIIIII ftware • <br />- 999 <br />COST SUMMARY FORM <br />Date : 28-Mar-2001 Permit or job no. <br />User : TAS Abbreviation <br />Filename <br />Agency or organization name :Division O/Minerals 6 <br />Permit or job action :Final Reclamation <br />TASK LIST (DIRECT COSTS) <br />NO. TASK DESCRIPTION FORM <br />USED FLEET <br />SIZE TASK <br />HOURS DIRECT <br />COST <br />001 -Existing reclamation tasks NA 1 1.0 $91,800 <br />002 -BacMill the pit with 200,000 cu. yd. of available materials NA 1 1.0 $100,000 <br />003 -Back/ill the pit w/ offsite materials; 3,429,250 x $7/cu.yd. NA 1 1.0 $24,004.750 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />suRTOTALS : 3.0 $24, 796,550 <br />includes inflation factor adjustment of : NA <br />INDIRECT COST <br />OVERHEAD AND PROFIT Liability insurance <br />Performance bond <br />Job superintendent <br />Profit <br />' assume tie! hours = 50°d o! lash hours <br />PROJECT MANAGEMENT- <br />Engineering work and/or contracUbid preparation <br />Reclamation management and/or administration <br />CONTINGENCY - <br />TOTAL DIRECT COST' ~ $24,196,550 <br />1.55 % of direct fatal = $375,047 <br />1.05 % of direct total = $254,064 <br />1.50 hrs`...$Ihr $33.50 total = $50 <br />10.00 %oldirect total= $2,419,655 <br /> TOTAL O 8 P = $3, 046, 616 <br /> CONTRACT AMOUNT (direct i O 8 P) _ $27,245,366 <br />4.25 % of Intr. NA total = $1,157,928 <br />5.00 %o/cntr. NA total= $1,362,268 <br />NA' NA total = NA <br />contingencies accounted for at task level <br />M-79-195 <br />none <br />M195-000 <br />Site :Road Runners Rest li <br />State :Colorado <br />County :Adams <br />TOTAL INDIRECT COST = $5,569,012 <br />TOTAL BOND AMOUNT (direct + indirect) _ $29,765,562 <br />
The URL can be used to link to this page
Your browser does not support the video tag.