My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC27281
DRMS
>
Back File Migration
>
Inspection
>
INSPEC27281
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:31:02 PM
Creation date
11/18/2007 10:09:56 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981047
IBM Index Class Name
Inspection
Doc Date
1/5/1983
Doc Name
INSPECTION REPORT DISTRIBUTION
Inspection Date
11/19/1982
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />MINE SITE EVALUATION INSPECTION REPORT <br />Blue Ribbon Mine <br />~i <br />PAGE 3 <br />e. Performance standards that assure reclamation quality and <br />timel iness: <br />2 1. Topsoil handling 5 7. Timing of <br />5 2. Backfilling & grading revegetation <br />5 3. Timing of reclamation 5 B. Highwall <br />5 4. Success of revegetation elimination <br />1 5. Disposal of excess spoil 5 9. Downslope <br />5 6. Handling of acid or spoil disposal <br /> toxic materials 1 10. Post mining <br /> land use <br />C. For each standard marked (2), what action(s) has the State <br />taken to cause the violation to be corrected? <br />A-2 Surface drainage controls were in the process of being upgraded <br />throughout the site. A contractor was hired to complete the work which <br />was incomplete at the time due to vacation schedules. After a number of <br />calls to the MLRD and permittee, arrangements were agreed upon to com- <br />plete the work immediately upon the return of the contractor. <br />B-1 A Deposit stockpile located on the western edge of a coal refuse <br />area just west of the Hubbard Creek road and haulroad intersection was <br />partially covered with refuse material. Arrangements were agreed upon <br />through the MLRD to have the material removed and isolate the stockpile <br />from the adiacent refuse stora4e area. See narrative statement for <br />D. For each standard marked (3), indicate what action(s) the <br />State should have taken. <br />E. For each standard marked (4), explain why it is unknown <br />whether or not the State has failed to take appropriate <br />action. <br />
The URL can be used to link to this page
Your browser does not support the video tag.