Laserfiche WebLink
Bdo~e~~avirprioa tLaa~rbii~ro~io~da~wypr~l~4~~iriprioa CL~sriodreb~~r <br />iti~~r alii~Y6~ i~YearL~M1r ~i err a~Y ar~edir~~pll~~~iw~~t ~Mio~ <br />f `. <br />Tbae are m iletm of ~~[ ttara prevtas mspOCham that <br />bar Qo this partial Phase I aad partial Phase II lib inspection. <br />Ibis iotpectim is in rapooae b a partial Phase II Boodlidase Applicadm abmiitbd by NCIG <br />Fotecid inc. (ldtar, ). E. 9tovtr ~ Aasociales) on Mw~ 27.2001. Ibis Coiaado Division of Mimab <br />and C~oe3' (Division) inspecticn was s~edubd $ Jane 20, 2001 m aoorpliaooe with hale 3.03.2(2). <br />The appliation was atpaoded $ partial Phase 1 Bcod rebate as well (Apri12, 2001). The purpae of <br />the impecfim is b evahrale the: <br />ikecLmetion opaatiom albgad b have been oarrpbted [Rule 3.03.2(2)]. <br />ReaWnimg Phase I recLmatian work allot the Pbase I Good Release Applicatim of Jaausry 23,1995 <br />(dxidm of Oabbtr 19, 1995) aoodsMd of 1) removal aFtwo gnuaodavater monitoring wd4, 2) removal <br />of a wlvert (G3) [Division leper of May 26.1995, Re: Phase 1 Hcod Relase Decision Cal Ridge No. <br />1 Mme (C-84~Otis)j, 3) dispoal of a pile of wade md~, 4) badcSlliog of a cublap0. s~istnbutim of a <br />topsail swc3~prle, 6) repair of a slump over om of the porCds, aad ~ wbiliaticn of terrace outskipa <br />whidr e~ibited a ahnnp at the time of the Good rebass impedicn. <br />The two mcoitariog weW were Ow 1 and ow-1 s at the Ley Loedo~rt. Reclematim of the site was <br />farad adequate $ release of this aea, and the lacy I,oadoit was remo~wd atom the permit by Tedmical <br />Revision 14 (Deomrbtr 18,1996). 7bm fhe applied has bem graded Phase); II and III band rebase <br />$ this work Qaespage4-26 of the Permit APP~~ ~ (P~l• <br />Culvert 3 vraa repated as having bem snored in 1995 (PAPPage4-57). A Divisim inspection of <br />OcbFm 15,1999 lbad that (.tirlvert 3 had ban removed. Calvatts 2 and 6 are permanent adverts. <br />Calvert s is intepal b the ssdmsofation pond. <br />The pile of wasb radrs is m itmn discussed in the PAP onpage4-59 (08-04AS). A mrrober of hags <br />rode were planed akog the tastem toe of the lows terrsee. They was b be borie~ <br />The baddtlliog of a artalope was repated to acocnrpiished. <br />Material in the two ramaming topsoil storage piles >s b be uteri in reclamation of the aedimeotrtion <br />Pond. 7bey have bem vegatabd far protection, and have bean properly marked. The reclamation of these <br />two pr7a is comidaed iolepal b the terLmaboa of the aediroeotatim pond Tbae topaorl prles and the <br />footprint of the piles are not b 6e rebased in this Phase I appiieaoion, bat will be ooatidaed for rdase <br />a9er they have bem recLimed under the ptr-visian ofRWe 3.03.1(5). <br />The stabilization of tetraoe outsbpa which e~ibited a sluorp at the time of the bond was reported as <br />aooomptisbed. <br />Phase II reclamation work included the awblishtomt of vagetatien vvhieh supports the approved <br />paamrining land use and whieb meets the approved srrooea standud far cower [Kula 3.03.1(2x6), <br />4.15.8(2) and (3)]. The postmioioig land use is agtierdpaal (graaog std caopbnd) (Permit page 463). <br />no. ~ of G r.o... t+t•) 2 0 ?'~ ~ / (s,~ittal•l ~~-' <br />