Laserfiche WebLink
iii iiiiiiiiiiiii iii ,3 %~ <br />999_ ,a U. S. DEPT. OF THE INTERIOR ~ " ~ w <br />0 <br />=OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT <br />..,qer. ;-;,.e • Mine-Site Evaluation Inspection Report <br /> <br /> 10. Type <br />1. PermiUce/Person 9. Permit Number a Permit b. RA <br /> WYOMING FUEL CO. C-013-81 ~ PP <br /> 2. Address 11. Inspection Date 12. Inspection Type 13. Join[ Inspection <br /> <br /> 10250 HIGHWAY 12 03/25/93 ~ ~ YiN <br /> rd-m-n <br />3. City 4. State 14. Permit Stazus 15. Site Status 16. Facility Type <br />WESTON CO A^ AP BEF <br />5. Zip Code 6. Phone Number 17. OSM Off ce # 18. RSI # 19. Land Cade <br />81091 -~ 719-868-2761 020 / 9 3 ] SF <br />7. Operator if Different than Pecmittee 20. M.S.H.A. ID # 21. State Code 22. County Cade <br /> <br /> BASIN RESOURCES, INC. OS-02820 OS 071 <br /> 8. Mine Name 23. AVS Permittee Entity m Number <br /> GOLDEN EAGLE 103972 <br />24. Performance Standard Categories <br />Codes: 1=Com licence 2=Noncom licence 3=Not Plann 4=Not S =Noncom licence Identified Elsewhere <br />A. Administrative D. Backfilling & Grading H. 1 Subsidence Control Plan <br />I. 1 Mining within Valid Permit 1. 4 Exposed Openings I. Roads <br />2. 1 Mining within Bonded Area 2. 1 Contemporaneous Reclamation 1 <br />1 Road Construction <br />. <br />3. 1 Terms & Conditions of Permit 3. 4 Approximate Original Contour 2. 2 Certification <br />4. 1 Liability Insurance 4. 4 Highwall Elimination 3.~Drainage <br />5. 1 Ownership and Control 5. 3 Steep Slopes (includes downslope) 4. 1 Surfa~ ing and Maintenance <br />6. 1 Temporary Cessation 6. 3 Handling of Acid & Toxic Materials 5. 4 Reclamation <br />B. Hydrologic Balance 7. 1 Stabilizazion (rills and gullies) - <br />1. 2 Drainage Control E. Excess Spoil Disposal J. Sigas & Markers <br />2. 2 Inspections & Certifications 1. 3 Placement 1. 2 Signs <br />3. 5 Siltation Structttres 2. 3 Drainage Control 2. 5 Markers <br />4. 5 Discharge Swctttres 3. 3 Staface Stabilization K. 1 Distance Prohibitions <br />5. 5 Diversions 4. 3 Inspections & Certifications - <br />6. 2 Effluent Limits L. Revegefation <br />7. 1 Ground Water Monitoring F. Coal Mine Waste 1. 1 Vegetative Cover <br />8. 1 Surface Water Monitoring (Refuse Piles/Impouadmeats) 2. 1 Timing <br />9. 5 Drainage -- Acid-Toxic Materials 1. 5 Drainage Control <br />10.2 Impoundments 2. 1 Surface Stabilization M. 1 Postmiaing Land Use <br />11.5 Stream Buffer Zones 3. 1 Placement <br />- 4. 1 Inspections and Certifications N. Other <br />C. Topsoil & Subsoil 5. 3 Impounding Swctures <br />1. 1 Removal G. Use Of Explosives =1) z o .:tTe otsrtrna,wce <br />2. 1 Substitute Materials 1. 3 Blaster Certi<cation <br />2) <br />~ <br />3.? Storage and Protection 2. 3 Distance Prohibitions - <br />- <br />4. 1 Redistribution 3. 3 Blast Survey/Schedule <br />3) <br />- <br />4.~Wamings & Records - <br />5. 3Control of Adverse Effects <br />25. Inspection Frequency 26. Inspection Hours 27. Bonded Acres 28. Acres <br />a Die of Lasl <br />State Complete 12/16/92 <br />Irapeaion <br /> <br />0 a Permit Review <br />12 <br />~ a ToW <br />~ bonded <br />9068.0 <br /> . 9068.0 a permitted <br />Flequeocy for previous 4 Calendar Qtrs. <br />Numberol Number of <br />b 37 <br />0 b ~~ 1 <br />0 released <br />0 <br />. <br />required complete <br />compete ^4 irt5peaions a . <br />b. Inspection Time . 45.0 b. Disturbed <br />inspeaions rnnduaed <br />10.0 c. Phase II <br />~•~ released (Estimated) <br />G Number of Number of c. Travel Time <br />p~artial~ ^g ~aions ^g 16.0 <br />d <br />t W <br />i <br />i <br />R 0.0 d. Phase CII <br />l <br />d e 1 of / 3 <br />Pag <br />inspeaiort~ mnduaed . <br />epor <br />r <br />t <br />ng re <br />ease <br />