My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC27090
DRMS
>
Back File Migration
>
Inspection
>
INSPEC27090
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:30:55 PM
Creation date
11/18/2007 10:08:47 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1991078
IBM Index Class Name
Inspection
Doc Date
10/29/2003
Doc Name
OSM Inspection Report
From
OSM
To
DMG
Inspection Date
10/2/2003
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
U. S. DEPT. OF THE INTERIOR <br />OFFICE OF SURFACE MINING <br />Mine Site Evaluation State Program <br />Permittee/ HONEYWOOD ~ Permit C-078-91 Field Visit 10/02/2003 Continuation Page <br />Person Number Date <br />28. <br />3=No[ <br />1. 1 Mining within Valid Permit <br />2. 1 Mining within Bonded Area <br />3. ~ Terms & Conditions of Permit <br />4. 1 Liability Insurance <br />i 5. 1 Ownership and Control <br />6. 1 Temporary Cessation <br />7. 1 AML Rec. Fees -- Non-Respondent <br />8. 1 AML Rec. Fees -- Failure to Pay <br />B. Hydrologic Balance <br />1. 1 Drainage Control <br />2. 1 Inspections & Certifications <br />3. 1 Siltation Structures <br />4. 1 Discharge Structures <br />5. 1 Diversions <br />6. 1 Effluent Limits <br />7. 1 CnoundWaterMonitoring <br />8. ~ Surface Water Monitoring <br />9. 3 Drainage --Acid-Toxic Materials <br />10. 3 Impoundments <br />11. 3 Stream Buffer Zones <br />C. Topsoil & Subsoil <br />1. 1 Removal <br />2. 1 SubstituteMa[erials <br />3. 1 Storage and Protection <br />Planned, 4=Not Started, S=Noncompliance Identified Elsewhere, 6=Previously Cited <br />D. Backfilling & Grading H. 3 Subsidence Control Plan <br />1. 1 Exposed Openings I. Roads <br />2. 1 Contemporaneous Reclamation 1. ~ Road Construction <br />3. 1 Approximate Original Contour 2. 1 Certification <br />4. 1 Highwall Elimination 3. 1 Drainage <br />5. 3 Steep Slopes (includes downslope) 4. 1 Surfacing and Maintenance <br />6. 3 Handling of Acid 6c Toxic Materials 5, 1 Reclamation <br />7. 1 Stabilization (rills and gullies) J• Signs & Markers <br />E. Excess Spoil Disposal 1. 1 Signs <br />I. 3 placement 2. 1 Markers <br />2. 3 Drainage Control K. I Distance Prohibitions <br />3. 3 Surface Stabilization <br />L. Re <br />egetation <br />4. 3 Inspections & Certifications ~ <br />1. <br />Vegetative Cover <br />F. C oal Mine Waste _ <br />2. 1 Timing <br /> (Refuse Piles/Impoundments) <br />3 M. 1 Postmining Land Use <br />1. Drainage Control <br />2. 3 Surface Stabilization N. Other <br />3. 3 Placement General <br />4. 3 Inspections and Certifcations Pertormance <br />5. 3 Impounding Structures Category <br />G. Use Of Explosives 1) <br />1. 3 BlasterCertification <br />2. 3 Distance Prohibitions 2) <br />3. 3 Blast Survey/Schedule <br />4. 3 Warnings & Records 3) <br />5. 3 Control of Adverse Effects _ <br /> Performance Standard Categories <br /> 30 CFR Counterpart <br />A. Administrative .................................................... ..................... <br />1. Valid Permit........._......_ ....................... _......_..................... ............773.11 <br />2. Mining within Bonded Area ...................................... ..........773.11 <br />3 . Terms & Conditions of Permit._..._ .......................... ..........773.17 <br />4. Liability Insurance ...................................................... ..........800.60 <br />5. Ownership and Control .............................................. ..........778.13 <br />6. Temporary Cessation_ ..................... _.....842.11(e) & 816/817.131 <br />7. AML Rec. Fees -- Non-Respondent ........................... .....870.15(b) <br />8. AML Rec. Fees -- Failure to Pay........_..........._ ......... .....870.15(a) <br />E. Excess Spoi! Disposal ...........................................(816/817.71-74) <br />1. Placement ...........................................................................................71(e) <br />2. Draina e Conno] .........................................._....................................71 (~ <br />8 <br />3. Surface Stabilization ..................._......_..................................._.........71(g) <br />4. Inspections &Certifications ...............................................................71(h) <br />F. Coal Mine Waste (Refuse Piles/Impoundments) ,,,,(816/817.81-84) <br />1. <br />2. <br />3. <br />4. <br />5 <br />Drainage Con[rol ......................................... ......................................83(a) <br />Surface Stabilize[ion .................................... ......................................83(b) <br />Placement ..................................................... ......................................83 (c) <br />Inspections and Certifications.._ .................. .....................................83(d) <br />Impounding Sttactures ................................. .............._..............._.........84 <br />Use of Explosives .................................. ................(816/817.61-68) <br />Blister Certification .........................._.......... ..................................._61(c) <br />Distance Prohibitions .................................... .....................................61(d) <br />Blast Survey/Schedule ............................_.... .....................................62-64 <br />Warnings & Records .........................._........ ..................................66 & 68 <br />Control of Adverse Effects ........................... ..........................................67 <br />B. Hydrologic Balance ...............................:......(816/817.41.57) <br />r. <br />1. Drainage Control........__ ................................ .............._.............45 <br />2. Inspections &Certifications....._ .................... ........_......_49(a)(10) <br />3. Siltation Sttactures ......................................... .............................46 <br />4. Discharge Stmc[ures .....:........._............._..... ........._.............,.....47 <br />5. Diversions ...................................................... .............................43 <br />6. Effluent Limits ................._............................ ._..........................42 <br />7. Ground Water Monttoring .............................. ........................41(c) <br />8. Surface Water Monttoring ............................_ .......,................41(e) <br />9. Drainage--Acid -Toxic Materials ................... ........................41(f) <br />10. Impoundments ................................................ ............................49 <br />] 1. Stream Buffer Zones ...................................... .............................57 <br />Topsoil &Subsoil ........................................ .......(816/817.22} <br />1. Removal ............................................................ ......................22(a) <br />2. Substitute Materials ........................................... ......................22(c) <br />3. Storage and Protection ....................................... ......................22{c) <br />4. Redistribution .................................................... ......................22(d) <br />D <br />1. <br />2. <br />3. <br />4. <br />5. <br />6. <br />7. <br />1. <br />2. <br />3. <br />4. <br />S. <br />H. <br />I. <br />Subsidence Control Plan ................:........................(817.121-122) <br />Roads ................................................................. (816/817.150-151) <br />1. Road Constmction ...........................................................................150(c) <br />2. Certification ........................................._.._......_..................._..........151(a) <br />3. Drainage ................. (b) ( ) <br />..............................................................150 -151 d <br />4. Surfacing and Maintenance_ .................._........................._ I50(e)-151(d) <br />5. Reclamation ......................................................................................150(1) <br />J• Signs & Markers .......................................................(816/817.11) <br />[. <br />2. <br />Signs ..................................................................................... I I (a),(b),&(c) <br />Markers...... _ ................................................ _....... _...11(a). (b),(d),(e). &(1) <br />Distance Prohibitions .......................................................(761.11) <br />Revegetation ..................................................... (816/817.111-116) <br />Vegetative Cover .......................................................................1 ] 1 & 116 <br />Timing .................................................................................................. l I3 <br />Postmining Land Use ..............................................(816/817.133) <br />Backtilling & Grading ..............................(816/817.95-107) K <br />Exposed Openings .....................816/817.13, ]4, 15, & 823.11 & 21 L <br />Contemporaneous Reclamation ........................ ..........................100 <br />Approximate Original Contour ......................... .................102(a)(I) 1~ <br />Highwall Elimination ........................................ .................102(a)(2) 2. <br />Steep Slopes (includes downslope) ................... .........................107 lyl, <br />Handling of Acid & Toxic Materials ................. .....................102(c) <br />Stabilization (rills and gullies) ........................... .......................95(b) <br />Page 2 of <br />
The URL can be used to link to this page
Your browser does not support the video tag.