Laserfiche WebLink
~ III IIIIIIIIIIIII III ,~ ti ~ <br />tIL~ ~, <br />October 12, 1994 <br /> <br />Mr. Gary Curtiss OC71 ~ 1994 <br />State of Colorado ~,.,,.-,. .. ,..~. <br />Division of Minerals and Geology ..~•; , _. -; _ ~L~Gy <br />1313 Sherman Street, Room 215 <br />Denver, Colorado 80203 <br />Dear Gary: <br />This letter is intended to address Item #1 of your inspection report dated <br />September 29, 1994 with regard to the concrete batch plant located outside the permit <br />boundary area. <br />We concur that the concrete batch plant, currently under construction, is outside <br />the mining area. It is located on a separate parcel of land (see enclosed survey) and <br />has been separately permitted by the City of Brighton. It will operate separately from <br />our aggregate processing plant in the manufacture of concrete. We will supply <br />material to the plant from both our mine and outside sources. It may operate or cease <br />to operate completely independent of our mining operation based strictly on the <br />market demand in the Brighton area. Reclamation on the aggregate facility will remain <br />as per our permit. Because of this operational independence, we do not want the <br />current permitted concrete plant on the mine site to be affected. <br />Sincerely, <br />F.P. ;' hip" Spratlen IV <br />P sident <br />Enclosure <br />4395 WASHINGTON <br />P.O. BOX 2290 <br />DENVER. CO 80201 <br />(303) 292-1771 <br />