Laserfiche WebLink
i ~ ~ - l l <br />f ~' i, <br />~• ~ i' <br />~ ~~~'~ J~ i ~ ~ • <br />• I I <br />I f I III ~ II III <br />ZV. Status of ?roblem 3esolution <br />The '~o1_'ow_ng 'tens c tern pmbiems identi°'ed at previous zsaection. Proo~ <br />into three categories. These are: (1) problems resolved; (2) resolut_'on still: <br />(3) operator del:nqu i The date that the ?roblem is resolved oz the date t1 <br />is deemed delinquent i .to be clearly stated. <br />Problems resolved <br />1. Construction o the mine fan accoustical block barrierhas been comple <br />the specified timefra e. The deadline for installation of the barrier wasl <br />1982. <br />1. Clean and repel the inlet to the culvert near the turn-off to the <br />disposal pile by Febru r 1, 1982. <br />2. Cover the new c vert, east of the yard, by February 1, 1982. <br />are eZassi`ied <br />process; and <br />the operator <br />within <br />ary 1, <br />