Laserfiche WebLink
-. ~ ! ~ _ <br />I <br />_ -? V <br />SRS :~J:. 33 3:.e ^,(!e•+ _+-._'-.._. ~ 52^. <br />3 :C :S ~ <br />~7i35 d.:r 3e C'_-3 __.'.5 ,53;i2~ __ ___ - __ iC= <br />_.`..3 _: Cicd es 3 ._3~.^.7 7. _:_ _dS _1i3_ __7Vi3 _'On3 7_ _Le __ -..._„_; __C.-:{ ~..__.. . ___ <br />ex-['.,...'- _'__.~ ..e ....._+2 O_ ..o _. n_2_~_,.n. a.:d ___..•"'S _.._"__".^.E.^.L _C ___~'s ___._ <br />-_-_ _ _._ ..^.S: ?C _-OP. _.,_ _3__-_? J _-m7i] :e'_.y :.:@ 0,-85 s.^.d'3e :::i3 `Jf:S, ~:_ -C =._ <br />c:e se^ct. - <br />4.03 Roads <br />The previous inspection report noted that coal had been spilled along the mine <br />access/haul road, and particularly at the intersection of the mine road and County Road <br />2120. At the time of this inspection, the entire haulJaccess road from the intersection <br />to the coal stockpile appeared to be coated with coal fines. Coal dust was evident in <br />the roadside ditch and on cut and fill slopes and vegetation adjacent to the road. <br />Apparently, the coal spillage is a result of overloading of the haulage trucks. The <br />problem had not been noted at Red Canyon prior to the February inspection. Continued <br />accumulation of coal in and adjacent to the haul road and ditches will potentially <br />cause disturbance to the hydrologic balance outside the permit area. <br />4.05 Hydrologic Balance <br />Two problems were noted in the vicinity of the coal stockpile. Coal had been <br />spilled over the berm south of the pile near the outlet of the recently installed culvert. <br />The coal must be removed and the berm reestablished. <br />The inlet of the culvert near the turnoff to the refuse disposal had been <br />repaired, but the culvert had become clogged again. <br />The diversion ditch, drainage ditches and remaining culverts and the sediment <br />pond appeared functional. <br />Certain aspects of the mining plan were discussed with the operator, including <br />the possibility of an experimental full extraction panel, limitations on the underground <br />operations until additional hydrologic monitoring systems are installed and data collected <br />the need for additional piezometers below the waste pile and the suitability of the <br />proposed subsidence monitoring plan. These issues will be addressed in a separate <br />letter within fine next two weeks. <br />