My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC26290
DRMS
>
Back File Migration
>
Inspection
>
INSPEC26290
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:25:46 PM
Creation date
11/18/2007 10:04:36 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981025
IBM Index Class Name
Inspection
Doc Name
Inspection Report
Inspection Date
9/15/2004
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IV. ENFORCEMENT ACTIONS <br />The following identifies enforcement actions taken during this inspection, the required <br />abatement and date of abatement for the violation, previous violations still requiring <br />abatement and the termination of violations cited during previous inspections. <br />North Thompson Creek C-81-025 <br />15 Sept 2004 <br />NOTE: Attach appropriate VIOLATIONS or CESSATION ORDER CODING FORMS <br />Notice of Violation CV-2004-004 was issued as a result of this inspection. The violation was <br />issued for failure to maintain ditches to minimize adverse impacts to the hydrologic balance in <br />violation of Rules 4.05.3(1) and 4.05.3 (4J and for failure to properly control the discharge from <br />a treatment facility in violation of Rule 4.05.7. <br />First, the ditch from the discharge from the portals to the Long Pond was partially blocked, <br />causing water to leave the ditch and flow down the light-use road. Water had, at the time, <br />flowed approximately 150 yards down the road. Second, the primary discharge from <br />treatment pond T-2 is partially blocked, causing flow from the emergency spillway pipe. This <br />pipe has been cut-off, causing the discharge to flow overland into pond P-9. Approximately <br />YZ-acre is covered with water. <br />The abatement for this violation is first, to clean the ditch from the portal discharge to the Long <br />Pond and perform any other maintenance as necessary. Second, the Operator needs to <br />clean the primary discharge pipe on treatment pond T-2 and install an anti-clogging device. <br />The emergency discharge pipe needs to be fixed so none of the discharge flows overland. <br />These abatements must be completed by 21 October 2004. <br />
The URL can be used to link to this page
Your browser does not support the video tag.