Laserfiche WebLink
<br />U. S. D~PT. OF THE INTER ~~~ ~~~~~~~~~~~~~ ~~~ <br />OFFICE OF SURFACE bIINING RECLAMAITON AND ENFORCEi _... <br />Mine-Site Evaluation Inspection Report ~•~ <br /> <br />1. Permittee/Person <br />9. Permit Number lo. Type <br />a. Permit b. RA <br /> TWIN PINES IIVVESTMENT LTD. Z 4 C-058-83 PP <br /> 2. Address 11. Inspection Date 12. Inspection Type 13. Joint inspection <br /> 1805 COUNTY ROAD 86, PO Bo ~8'i9'~t' at ~j1i1e1 ~~ 05/05/93 OFl © YiN <br /> <br />3. City <br />4. State nr-on- rr <br />14. Permit Status <br />15. Site Stams 16. Facility Type <br /> ROCKVALE CO A^ AP <br />5. Zip Code 6. Phone Number 17. OSM Office # 18. RSI # 19. Land Code <br />81244 -~ 719-784-0369 020 <br />7. Operator if Different than Perrnittee 20. M.S.HA ID # 21. State Code 22. County Code <br /> <br /> OS-03793 OS 043 <br /> 8. Mine Name 23. AVS Pemtittee Entity ID Number <br /> TWIN PINES #2 122262 <br /> <br />24. Performance Standard Categories <br />Codes: 1=Com licence 2=Noncom lianc S=Not PLsnn 4=Not S -Noncom licence Identified Elsewhere <br />A. Administrative D. Baekfdling & Grading H. -Subsidence Control Plan <br />1. Hitting within Valid Permit 1 _Exposed Openings I. Roads <br />2. Mining within Bonded Area 2. Contemporaneous Reclamation <br />1 • <br />Road Construction <br />3._Temrs & Conditions of Perm it 3._Apptoximate Original Contour - <br />2. <br />Cesnfication <br />4._Liabili[y Instttance 4 _Highwall Elimination - <br />Dreinage <br />3. <br />S.,Ownership and Control 5.-Steep Skrpes (includes downslope) - <br />4. Surfacing and Maintenance <br />6._Temporary Cessation 6.-Handling of Acid & Toxic Materials 5. <br />Reclamation <br />B. Hydrologic Balance <br />7._Stabilization (rills and gullies) <br />_ <br />1. 1 Drainage Control E Excess Spoil Disposal J• Signs & Markers <br />2.-Inspections & Certifications I._Placemem 1.-Signs <br />3.-Siltation Stntctures 2._Drainage Control 2._Markers <br />4._Dist:harge Swcttires 3._Stuface Stabilization K. Distance Prohibitions <br />5. Diversions 4._Uispections & Certifications - <br />6. Effluent Limits L. Revegetation <br />7. Ground Water Monitoring F. Coal Mine Waste 1.-Vegetative Cover <br />8._Surface Water Mottitoring (Refuse Pites/Impouodments) 2.-Timing <br />9._Drainage -Acid-Tout Materials 1._Dtainage Control <br />10.-Impoundments 2.-Surface Stabilization M. -Postmining Land Use <br />11. <br />Stream Buffer Zones 3._Placement <br />- 4.-Inspections and Certifications N. Other <br />C. Topsoil & Subsoil 5.-Imptwnding Stntcntres <br />1. Removal G. Use Of Explosives -1) <br />2. .Substitute Materials 1._Blaster Certification <br />2) <br />3._Storage and Protection Distance Prohibitions <br />2. - <br />4.-Redistribution - <br />3._BlastStwey/Schedule 3) <br /> 4.-Warnings 8t Records - <br /> 5._Control of Adverse Effects <br />25. Inspection Frequency 26. Inspection Hours 27. Bonded Acres 28. Acres <br />a Oats of last <br />Slate Complete <br />Irepetlon / / <br /> <br />1.0 a. Pemtit Review <br /> <br />0.0 e. Toral <br /> <br />bonded <br /> <br /> <br />200 <br />F7equeocy ror previous 4 Cal®dar Qtrs. <br /> <br />b. Number of Numberot <br /> <br />2 <br />0 <br />i <br />i <br /> <br />0 <br />0 <br />b. Phase I <br />released d Pecmined <br />requied mmplete <br />complete 0 inspeWore 0 . <br />nspect <br />on Tune <br />b. . 0 0 b. Disnabed <br />~qdp~ mMutlad <br />T <br />l T <br />~ 6'0 <br />0.0 c. Phase II <br />releaud (Estimated) <br />c Numberol Number of rave <br />c. <br />une <br />requited ^ ~ diore ^ <br />~ 0 mtd~ed 0 ~ <br />1S d Report Writing <br />U.U <br />~ d. Phase III <br />released <br />Page 1 of _ <br />