My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC26171
DRMS
>
Back File Migration
>
Inspection
>
INSPEC26171
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:25:39 PM
Creation date
11/18/2007 10:04:02 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981035
IBM Index Class Name
Inspection
Doc Date
8/25/2000
Doc Name
COAL INSPECTION REPORT
Inspection Date
8/16/2000
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
III. COMMENTS -COMPLIANCE <br />Below are comments on the inspection. The comments include discussion of observations made during <br />the inspection. Comments also describe any enforcement actions taken during the inspection and the <br />facts or evidence supporting the enforcement action. <br />This was a complete inspection of the King Coal Mine for the month of August, 2000. The site is back to <br />normal operations and the "bone-yard" is cleared of waste. <br />RECORDS: Records were inspected and found to be in compliance. Further details of the records <br />inspection can be found on page 5 of this report. <br />HYDROLOGIC BALANCE: Both ponds had water in them but were not discharging. The East pond had <br />approximately 3 feet of water in it and has been partially cleaned. The W est pond had about 1.5 feet of <br />water and will be cleaned out when the pond dries out more. The ponds are stable and capable of <br />functioning as designed. All culverts and ditches were inspected and all were found to be capable of <br />functioning as designed. <br />GENERAL MINE COMPLIANCE: The site is well maintained and stable. No problems were noted during <br />the inspection. The SAE rock check dam needs some minor maintenance In the form of more gravel and <br />replacing a dislodged cinder block. <br />EXCESS SPOILS AND DEVELOPMENT WASTE: The waste pile is stable and all water is diverted off <br />the top and into ditches, however the pile needs to be graded to the correct slope and the lifts should be <br />no more than 1 foot to insure proper compaction is achieved. Work on the 100 year clean water <br />diversion ditch and the riprapped side ditches needs to be completed no later than October of this <br />year. <br />
The URL can be used to link to this page
Your browser does not support the video tag.