My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC25752
DRMS
>
Back File Migration
>
Inspection
>
INSPEC25752
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:25:16 PM
Creation date
11/18/2007 10:01:53 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977020
IBM Index Class Name
Inspection
Doc Date
8/14/1997
Doc Name
06/17/97 INSPECTION REPORT PIT 1 PN M-77-020
From
DELTA SAND & GRAVEL
To
DMG
Inspection Date
6/17/1997
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~- ~: ~ III IIIIIIIIIIIII III ~ ~""~'~ <br />P~OHIA <br />52 -4174 ./ ]~, /1 _ s1M ~WV ~ ~' NMVW <br />RANGED (~/v~ <br />675-2315 READY MIX CONCRETE SAND & GRAVEL <br />August 8, 1997 <br />RECEIVEC <br />Mr. Steve Shuey <br />Division of Minerals and Geology <br />1313 Sherman St, Room 215 <br />Denver, CO 80215 <br />Dear Steve; <br />RE: 6-17-97 Inspection Report <br />Pit #1, M.L.R.B. Permit # M-77-020 <br />AUG 14 1997 <br />~~ <br />e~~A <br />:..e .....~.. o. o <br />DELTA <br />874-9159 <br />Division of rvhinerais 8 Gec~oc~y <br />This letter is to respond to your observations and to the problems noted in the inspection <br />report. As you are now aware we filed an amendment to this mining operation on July 21, <br />1997. This amendment may have addressed some of your observations, particularly the bonding <br />and reclamation issues concerning bank sloping. I will supply a short response to the <br />observations in the order presented and then explain what we have done on the problems. <br />OBSERVATIONS <br />• As you noted Phase 2 is nearly mined out. That is why we have amended the permit to <br />increase the size of the mine and extend its life. The amendment also takes out the <br />Staging/Phasing part of the plan so the site can be mined more efficiently and the islands <br />were removed from Phase 1 because we did not have the material to wnstruct them. We <br />began grading and shaping on the slopes shortly after your inspection and are nearly <br />finished on the north, east and south areas. The west side sloping will be done by the <br />end of the month. Topsoiling on the slopes that will not be disturbed later will be <br />completed by the end of the year. <br />• We prepared a new bond calculation work sheet as part of the amendment. This estimate <br />included the cost to dewater the lake, slope the highwall and resod the area. Review of <br />that document in the amendment submittal will help address this observation. The <br />removal of the phasing is accomplished by limiting the amount of area that can be <br />disturbed at any one time. <br />• Please see the amendment submittal and the response above. <br />
The URL can be used to link to this page
Your browser does not support the video tag.