Laserfiche WebLink
<br />CIRCES Cost Estimating Software <br />BULLDOZER WORK <br /> <br />PROJECT IDENTIFICATION <br />Agency or organization name :Division O! Minerals 8 Geology <br /> <br />Task p : 005 State :Colorado PermiUlobp M-62-141 <br />Dale: 77/29199 County :MoNar Abbreviation :none <br />User: TAS Sile :Juniper Limeslone Quarry Filename :M74 t-005 <br /> <br />Permi[ or otherjob action :Final Reclamation <br /> <br />Task description :BacMill & grade 4 etPe•It. overburden to final contours <br /> <br />HOURLY EQUIPMENT COST Basic machine:Ca1 D8N (1996) Horsepower : 265 <br /> Blatle type Semi-Universal <br /> Attachment no. 1 : ROPS Cab Shin Dasis : 7 per day <br /> Attachment no. 2 : NA <br /> Utilization % Cost data source : (CRG) <br />Cost Breakdown- Ownership cosMOUr : 535.17 NA <br /> Operating cosUhcur: $55.64 r00 <br /> Ripper op. cosUhour: 50.00 NA <br /> Operator rosl/hour: $23.12 NA <br /> Total unit cosUhour : 87 73.93 Total fleet cos6hour ~ $113.93 <br /> <br />MATERIAL QUANTITIES <br />Initial <br />Swell <br />Loose <br />volume: 6,453 CCY factor: 1.345 volume. 8,679 LCY <br />Source of quan tity take~oN :6453 <br /> <br />Source of est swell factor:permir <br /> <br />HOURLY PRODUCTION <br />IJ <br />n i ion Corr i F or <br />Average push distance : 150 feet Source <br /> Operator Skill: 0.75 (avg.) <br /> Matedal consstency: 1.00 (Car HB) <br />Unadjusted hourly production : 591 LCV/hr Dozing method : 7.20 (slot) <br /> Visibility: 1.00 (avgJ <br />Matenal consistency tlescripbon: Job efficiency: 063 (tshdUtlay) <br />Consolidaletl smckpile Spoil pile : 7.00 (doz-oc) <br /> Push gradient: 7.07 (Car HBJ <br />Average push gradient : 3 00 °~b (neg) Allputle : 100 (Cat HBl <br /> Matenal weight: 088 (Cal HBJ <br />Average site altitude : 5,000 feet Blade type : / 00 (S or U) <br /> <br />Material weight : 2,600 Ibs/LCY Net correction: 071 <br />Material weight description <br />Limeslone ~ Crushed Adjusted unit production : 417.45 LCY/hr <br /> <br /> Atllusted fleet production : 477.45 LCY/hr <br /> <br />JOB TIME AND COST <br />Fleet size <br />: 1 Dozers) <br />Total job time : <br />20.79 <br />Hours <br />Unit cost : $0273 /LCY Total job cost : $2,369 <br />