Laserfiche WebLink
<br />(Page 3) <br />MINE ID # OR PROSPECTING ID #: M-Ri-112 <br />INSPECTION DATE: ~/17/nn <br /> <br />INSPECTOR'S INITIALS: ICS <br />The following problems (PB) and/or possible violations (PV) (and suggested corrective actions) were identified during this <br />inspection. The problems should be corrected by the dates given, or they will become possible violations. The possible violations <br />should be corrected by the dates given to reduce their severity when considered by the Mined Land Reclamation Board. The <br />inspector noted on the previous page should be notified of all corrective actions taken. <br />PROBLEMS/POSSIBLE VIOLATIONS <br />AND <br />CORRECTIVE ACTIONS <br />CORRECTION <br />DATE <br />10 / 01 / 00 <br />The nlinine plan does not require the County to salvage toosoil. However. i <br />3.1.9. <br />to salvage and stockpile this resource as is req <br />PB or PV: PB <br />TOPIC(S): TS.mP <br />Since information provided in the permit package indicates that there is topsoil available at the site and - - <br />the reclamation plan commits the County to salvage and dock iln P toosoil for use in reclaiming thTnit <br />the County must submit a Technical Revision to the permit revising the mining plan and committing the <br />Coun to salvage. seereeate. and stockpile topsoil and to stabilize the topsoil stockpiles. if not emoloved <br />in reclamation within one rg owing season. <br />10/ O1/ 00 <br />PB or PV: ~~ <br />TOPIC(S): ~~ <br />The Countv must indicate how much topsoil. suitable for reclamation use. is available at the site and <br />demonstrate how Chic vohime together with that remaining to he salvaged during~~ture mining,. is <br />adequate to met the requirements of the reclamation plan. If this volume of usable toosoil cannot be <br />shown sufficient to meet the requirements of the reclamation~l~, The County mutt indicate thru a <br />Technical Revision. how it intends to make rqi the defiriency~,g, by imoortine material <uoolementine <br />available overburden, taking additional topsoil (depending upon whether there is any and how much), <br />revision of the reclamation plan, or what. This corrective action, including any proposed revision of the <br />reclamation plan, can be satisfied by inclusion in the Technical Revision required above to satisfy <br />Compliance Probleml. <br />