My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC25608
DRMS
>
Back File Migration
>
Inspection
>
INSPEC25608
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:25:09 PM
Creation date
11/18/2007 10:01:12 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980178
IBM Index Class Name
Inspection
Doc Date
3/11/2002
Doc Name
Inspection Report
From
DMG
To
Moores Mining Ranching & Mill
Inspection Date
2/14/2002
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Date : 05-Mar-2002 Permit or job no, <br />User : SSS Abbreviation <br />Filename <br />M-1980-178 <br />none <br />Mi78-000 <br />Site : MOOn?S Pit <br />State :Colorado <br />County :Mesa <br />Agency or organization name :DMG <br />Permit or job action :Routine Reclamation Cost Estimate Recalculation <br />TASK LIST (DIRECT COSTSi <br />NO. TASK DESCRIPTION FORM FLEET <br />USED SIZE TASK <br />HOURS DIRECT <br />COST <br /> No North Highwall Reclamation Required -Mined at 3H:1V Grade <br /> No East Highwall Reclamation Required - Mined at 3H:1 V Grade <br />03b -Replace Fines on 9.6 Acre Affected Area as Growth Medium dozer 1 27.3 $4,022 <br />04b -Revegetate 9.6 Aces o/Affected Area revege 2 24.0 $8,712 <br />05b -Transport Reclamation Equipment toffrom Site mobilize 3 4.6 $1,735 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />SUBTOTALS: 55.9 $14,469 <br />' inClUtlea inflation factor adjustment of: NA % TOTAL DIRECT COST' = 514,469 <br />.. ., .. I <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT- Llabillty lnSUranCe: 1.55 %Of dlleCt total= $224 <br />Performance bond : 1.05 % of direct total = $152 <br />Job superintendent : NA' NA NA total = NA <br />Profit : 10.00 % of direct total = $1,447 <br />'not 2quired (or eqp. operator serves as super) TOTAL O & P = $1, 823 <br /> CONTRACT AMOUNT (direct+O&Pi= $16,292 <br />PROJECTMHNAGEMENT- <br />Engineering work and/or contracUbid preparation : NA NA NA total = NA <br />Reclamation management and/or administration : 5.00 % of cntr. NA total = $815 <br />CONTINGENCY- NA' NA total = NA <br />'contingencies accounted ror at task level TOTAL INDIRECT COST= $2,638 <br />TOTAL BOND AMOUNT (direct + indirect) _ $17,107 <br />___ ___..,___..__.---_ mrm ,. , <br />-_~ ~~ ,._ ~w, -- - - '-----_~E <br />
The URL can be used to link to this page
Your browser does not support the video tag.