Laserfiche WebLink
(Page 3) <br />MINE ID # OR PROSPECTING ID # M-1980-178 <br />INSPECTION DATE 2-14-2002 <br />INSPECTOR'S INITIALS SSS <br />The following problems (PB) and/or possible violations (PV) (and suggested corrective actions) were identified during this <br />inspection. The problems should be corrected by the dates given, or they will become possible violations. The possible <br />violations should be corrected by the dates given to reduce their severity when considered by the Mined Land Reclamation <br />Board. The inspector noted on the previous page should be notified of all corrective actions taken. <br />PROBLEMS/POSSIBLE VIOLATIONS <br />AND <br />CORRECTIVE ACTIONS <br />CORRECTION <br />DATE <br />1 The current increased pit dept and highwall mnfigtiration is not in compliance with the mine plan <br />CORRECTIVE ACTION: <br />03 / 31 / 2002 <br />PB or PV: PB <br />TOPIC(S): MP <br />Submit a technical revision application addressing the increased mining depth and oversteeoened BSa B~ - <br />highwalls and proposed changes to the reclamation plan resulting_from these revisions: or bring the <br />site into compliance with the approved permit specifications by the correction date specified. <br />2. The site is current~tmder-bonded <br />CORRECTIVE ACTION: <br />Adequate financial warran]y must be submitted to DMG bathe correction date~ecified . <br />3. <br />CORRECTIVE ACTION: <br />05 / 06 / 2002 <br />PB or PV: PB <br />TOPIC(S): FN <br />/ / <br />PB or PV: <br />TOPIC(S): - <br />I, Steve Shuey, hereby certify that on March 5, 2002, I deposited a true and complete copy of this foregoing inspection <br />report in the United States Mail, first class postage paid, to the operator of record for this site at the address indicated, <br />and to those others within the body of this report who have been designated to receive copies (DMG personnel <br />excepted) <br />Signature <br />