Laserfiche WebLink
with true topsoil that is stripped from areas as they become affected. In fact, if such mixing could occur with <br />freshly stripped topsoil and then placed soon thereafter on areas being reclaimed, it may yield the best results. But <br />stockpiling all topsoil as it is encountered for later use is important. Please remember to place all topsoil out of the <br />way of deterioration from traffic, contaminants, and erosion and seed it to protect it. I have one last question: <br />What is a labeled topsoil pile doing at the switchback on the access road below the permit area? It should be <br />moved up to an appropriate location in the permit area. <br />Fuel Storaee <br />Thank you for handling the fuel storage issue. I will watch for all storage to be up at the mill, eliminating the <br />chance for leaks. Please be attentive to careful transfer, and to clean up spills in a timely manner. <br />Thank you for your expressed interest in keeping this DMO operation in compliance. I look forwazd to working <br />with you and Mr. Baca as the Incas Mine and Mill operation becomes "your own." Please do not hesitate to contact <br />me or the other staff at this office if you have questions or concerns about this letter or the permit in general. I may <br />be reached at the Division's Durango field office: 701 Camino del Rio, Room 125, Durango, CO 81301; <br />telephone 970/247-5193 or fax 970/247-5104. <br />Sincerffely, / <br />~~~i `~ <br />Bob Oswald <br />Environmental Protection Specialist <br />A:~incas pb new oper/rco <br />