My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC25499
DRMS
>
Back File Migration
>
Inspection
>
INSPEC25499
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:25:03 PM
Creation date
11/18/2007 10:00:40 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1990106
IBM Index Class Name
Inspection
Doc Name
LIMITED IMPACT OPERATION 110 APPLICATION FORM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~, , <br />' -4- <br />-,cHIBIT F - Proof of Compliance with local Government Zoning <br />In accordance with 34-32-115(4)(e), the Board must make a finding that the operation <br />will be 1n compliance with local zoning or subdivision regulations. You are not <br />required to submit this information, but a submission would assist the Division's <br />processing of the application. When the Oivision notifies the local government of the <br />existence of this application, it will request information regarding compliance with <br />applicable local law. It is intended that operators may concurrently come into <br />compliance with local requirements at the same time the Division is processing this <br />application. Information regarding the status with local government will be helpful. <br />EXHIBIT G -Source of Legal Right-to-Enter <br />This could be a copy of the lease, deed, abstract of title, or current tax receipt. An <br />acceptable alternative would be a statement acknowledged by a Notary Public that the <br />operator has the legal right to enter the mine. . <br />EXHIBIT H -Reclamation Costs <br />For a 110 permit, if the operator requests financial warranty to be less than $5,000.00, <br />the operator must submit facts to support such a request. Otherwise, a financial <br />warranty of ;5,000.00 will automatically be set. For all 111 permits, the financial <br />warranty shall be $2,500.00 per acre. <br />'XHIBIT I - Terms of Governmental Contracts (111 Applications only) <br />For Special 10-Day (111) permits, the operator must submit a copy of the contract or <br />other proof that proves the necessity of a Special 10-day permit. The operator must <br />also submit evidence of the financial warranty provided under the governmental contract, <br />if it was required. <br />NOTICE PROCEDURES <br />After the application is considered "filed" (pursuant t <br />Land Reclamation Division, notice procedures outlined i <br />followed. (Format for such notices will be included i <br />MLR staff informing you of the Completeness ("filing") <br />FINANCIAL WARRANTY <br />o Rule l.l(]0) with the Mined <br />n rule 3.2 and/or 4.2 must be <br />rt the letter you receive from the <br />of your application.) <br />All applicants must submit a financial warranty in an amount determined by the Board <br />prior to permit issuance. The iaw and regulations allow for several different types of <br />financial warranty. You should determine what type of financial warranty you desire to <br />use and obtain the appropriate forms from the Mined Land Reclamation Division during the <br />application review period to facilitate finalization of an acceptable financial warranty <br />and permit issuance. <br />
The URL can be used to link to this page
Your browser does not support the video tag.