My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC25355
DRMS
>
Back File Migration
>
Inspection
>
INSPEC25355
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:24:55 PM
Creation date
11/18/2007 9:59:43 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981047
IBM Index Class Name
Inspection
Doc Date
6/16/1981
Doc Name
INSPECTION REPORT C--047-81
From
MLR
To
SUNFLOWER ENERGY CORPORATION
Inspection Date
6/11/1981
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~, <br />~~ • <br />iS. Compliance :r th Colors do Sur:ace Coal 'il^iac Reclama"ion .ic[ <br />CRS 1473, as amended JJ-J7-IOI, et. sea., <br />and c e <br />Rules and Re4v_ations Zssued pu:s~:arrt :~ 1re .,ct <br />Taus includes a listing or rye particular provisions o: :.he :e;ulatory program which :+ere <br />examined dosing the course of t7.is inspection, and identlr_'es enforcement actions taken <br />during the inspection for failure to comply with the Rules and Regulatons, rlre .7ct and . <br />the permit. ~ <br />9.02 Signs and Markers <br />A thorough inspection of the perimeter markers was mnd~. The marker; are made of lath <br />painted orange on the top plus some markers are flagging tape in a tree. There are some <br />places where one marker cannot be seen from the next, rluq to dense shrubs, but Che boundary <br />is adequately defined. The operator was advised that corner markers would suffice for the <br />area above the mine (east) because of the extremely steep terrain. <br />4.05 Hydrologic Balance <br />1. The diversion ditch from the mine benc]r to sediment pond No. 2 was mostly repaired but <br />several large rocks which fell into the channel must Le rerrr~ved. <br />2. The culvert at the coal. stock pile area was clean but the inlet end was bent in. Nowever, <br />this should not affect the perfonriance of the culvert unless the inlet device is bent in <br />further. ' <br />3. A dewatering device was put into sediment pond No. 3. Tlri.s pond will be checked during <br />the July inspection to determine if it was built according to the approved plan. <br />4. The area on the north end of the mine bench has been regraded so that water should <br />drain properly. <br />4.12 Slides and Other Damage <br />Additional tension cracks were noted on the outslope of the mine bench. <br />9.15 Revegetation <br />The topsoil stockpile was recently seeded, and at this early stage, success appears to he <br />good. <br />
The URL can be used to link to this page
Your browser does not support the video tag.