My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC25310
DRMS
>
Back File Migration
>
Inspection
>
INSPEC25310
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:24:53 PM
Creation date
11/18/2007 9:59:28 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977193
IBM Index Class Name
Inspection
Doc Name
MINERALS PROGRAM INSPECTION REPORT
Inspection Date
4/15/1997
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
,~ <br /> <br />(Page 2) <br />MINE ID # OR PROSPECTING ID # m-77-193 <br />INSPECTION DATE April 15. 1997 INSPECTOR'S INITIALS TAS <br />OBSERVATIONS <br />1. A site inspection was made of the T.H.E. Aggregate Source Quarry located immediately west <br />of Canon City, along Tunnel Drive. <br />2. A site entrance sign was posted as required by Rule 3.1.12. <br />3. The operator is currently installing stormwater management controls along the existing <br />haul road corridor. Temporary drainage channels have been cut along both sides of the haul <br />road beginning immediately south of the office and continuing south to Tunnel Drive. The <br />operator has also installed three catchment basins along the haul road to increase the <br />detention storage of future stormwater runoff even though these structures ware not specified <br />in the current permit amendment application. The Division appreciates the initiative taken <br />by the operator to "go the extra mile" by installing these basins. <br />4. The spillway of Pond 2 has not been completed. Plans for completing the construction <br />were discussed. <br />5. Construction of Pond 3 has been completed. <br />6. Construction of Pond 4, Ponds 5-7, and the stormwater diversion ditch from Pond 1 to Pond <br />5 will begin following approval of the amendment application. <br />7. Pond i has been excavated. Construction of a spillway as well as :inlet and outlet <br />channels is expected to begin following approval of the amendment application. <br />8. No problems were noted during the inspection. <br />cc: Ken Klco <br />Azurite, Inc. <br />10001 CR 12, P.O. Box 338 <br />Cotopaxi, CO 81233 <br />Jim Stevens, DING <br />I & E Contact Address <br /> <br />NAME Edward J. Tezak, Jr. ^ BL <br />OPERATOR Tezak Hea w Equi pment Co., Inc. ^ FS <br />STREET 804 South First Street ^ HW <br />CZTY/STATE/ZIP Canon Citv , CO 81212 ^ HMWMD (~:H) <br /> ^ SE <br /> ^ WQCD (CH) <br /> ^ OTHER <br />
The URL can be used to link to this page
Your browser does not support the video tag.