Laserfiche WebLink
III. COMMENTS -COMPLIANCE <br />Below are comments on the inspection. The comments include discussion of observations made during <br />the inspection. Comments also describe any enforcement actions taken during the inspection and the <br />facts or evidence supporting the enforcement action. <br />This was a partial inspection of the Coal Gulch Mine conducted by Tom Gillis ofthe Colorado Division of <br />Minerals and Geology. Skies were cloudy and ground conditions were wet as a result ofmoderate rainfall <br />the previous evening. <br />The cable across the entrance to the access road was in place at the time of the inspection. <br />HYDROLOGIC BALANCE: <br />The water level in the sediment pond appeazed to be about the same as observed during the April <br />inspection. No new erosional features were observed, and ditches were in the same general condition as <br />observed in April. <br />REVEGETATION: <br />Perennial grasses still predominate vegetative cover on the reclaimed spoil pile. Some weedy species were <br />observed in several azeas, but not in significant concentrations. <br />