Laserfiche WebLink
• <br />1'T7. StatJS o_° ?roblem Resolut'on <br />The :ol/owing Gems concern problems identi-led at previous inspection. Probleas are c_assiried <br />into three categories. TF.ese are: (1} problems resolved; (Z) resolution still in process; and <br />(3J operator delinquent, the date that the ?roblem is resolved or t5e date t5at t5e operator <br />is deemed delinquent is to be clearly stated. <br />RESOLUTION IN PROGRESS <br />82-6. Repair refuse disposal road culvert and installation by June 21, 1982. <br />82-7, Regrade road drainage ditch along road north of the sediment pond by <br />June 21, 1982. <br />82-8. Reestablish ditch graded over to provide access to new piezometer by <br />June 14, 1982. <br />82-10. Clean out east diversion ditch by June 14, 1982• <br />PROBLEM RESOLVED <br />82-9. The berm south of coal stockpile has been rebuilt. <br /> <br /> <br />i< < .~~ <br />