Laserfiche WebLink
(Page 2) <br />MINE ID # OR PROSPECTING ID #: ~-i9e~-n9e <br />INSPECTION DATE: ~/inrns INSPECTORS INITIALS: ~_ <br />OBSERVATIONS <br />This inspection was conducted as part of the 4-year monitoring program conducted by the Division of <br />Minerals and Geology. Present at the inspection were Kate Pickford and Harry Posey, DMG, Greg Knell <br />and Jason McGraw, Robinson Brick Company, and Brad Mueller, Siloam Stone, Inc. Weather at the <br />time of the inspection was clear, windy, and approximately 45 degrees. <br />2. A sign is posted at the entrance to the site and the boundaries are marked. The site is adjacent to two <br />other permits. This permit is identified as the area including a portion of the pre-law disturbance at the <br />site; to the roadway; to the clay piles that are stockpiled relative to the Robinson Brick Company permit <br />)M-1977-326). A berm is located on this permit along the western edge of the site. This berm is going to <br />be extended to the north to connect to the topsoil stockpile located in the Bedrock Mine No. 1 permit <br />(M-1997-086) to control runoff from the site into the drainage located north of the site. <br />3. Activity at the site appears to fall within the guidelines of the permit. The current bond amount of $8,300 <br />appears to be adequate for reclamation of the site. A partial bond calculation, however, will be <br />conducted in order to confirm that the amount is adequate. <br />I & E Contact Address <br />NAME: Ferd Mueller <br />OPERATOR: Siloam Stone <br />STREET: 13Gn Rudd AVP.n11P. <br />CITY/STATE/ZIP: Cnnnn City. C(~ R1919 <br />Cc: ^ CE <br />^ BL <br />^ FS <br />^ HW <br />^ HMWMD (CH) <br />^ SE <br />^ WQCD (CH) <br />X Other: Harry Posey, DMG <br />