My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC25030
DRMS
>
Back File Migration
>
Inspection
>
INSPEC25030
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:24:38 PM
Creation date
11/18/2007 9:58:14 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1981185
IBM Index Class Name
Inspection
Doc Date
4/15/1994
Doc Name
BOND RECALCULATION-MAYDAY MINE PN M-81-185
From
DMG
To
SHALAKO INTERNATIONAL INC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />HYDRAULIC EXCAVATOR COST 6 PERFORMANCE DATA WORKSHEET cont'd <br /> <br /> <br />Model: CAT 205 (1986) <br />ADJUSTED COST SUBTOTALS <br />I Ezcavator: <br />Single shifts <br />I Double shifts <br />Triple shifts <br />Ownership Casts <br />Ezcavator: <br />$6.01 32.80 $1.40 51.81 $1.90 52.18 <br />54.51 51.40 S0.70 Attachment sat: <br />$4.01 50.93 S0.47 tl/A N/A N/A <br />-----.------------------- Overhaul 6 Operating Costs <br />HOURLY OPERATOR WALES <br />Labor Classification <br />Ezcavator -under .75cY <br />Ezcavator -.75cy 8 over <br />Nechanic <br />HOURLY EAUIPMENT COST SUIIHARY <br />51.55 51.70 <br />H/A II/A <br />sheet 2 of 2 sheets <br />$0.76 50.00 50.24 <br />N/A It/A N/A <br />Base Fringe F.I.C.A Unempl. Wk. Comp. Total ~ Shift <br />Rate Benefits 7.108 6.205 12 .50E (S/hr). Differential <br />514.30 53.50 51.10 $0.89 51 .19 521.58 ~ Day 50.00 . 2 shift/day avg.: SO.lS <br />514.45 53.50 51.11 50.90 51 .81 521.76 ~ Suing: 50.30 . 3 shift/daY avg.: 50.25 <br />514.60 <br />--------- $3.50 <br />-------------- 51.12 <br />----------- 50.91 <br />------- 51 <br />---- .83 <br />----- 521.95 I <br />-------- Ilight: 50.45 <br />------------------------------------------ <br />Ownership . Operating G Overhaul Costs <br />I Costs I Ezcavator Attachoent 82 <br />---------------------------------------------- <br />---------------------------------------------- <br />Single shifts : 510.20 510.13 II/A <br />Double shifts 56.60 510.13 N/A <br />Triple shifts 55.41 510.13 II/A <br />Operator I Total <br />Costs <br />---------- I Cost/HR (SI <br />------------------ <br />---------- <br />521.76 ------------------ <br />542.1D <br />521.91 S38.65 <br />522.01 537.55 <br />---------------------------------------------------------------------------------------------------------------------------------------- <br />---------------------------------------------------------------------------------------------------------------------------------------- <br />EOUIPNEHT PEAFORNAIICE DATA - - - EOUIPNENT SPECIFICATIOIIS - - - <br />---------- Height ---------~--- 1lachine Diaensions ----I-°--------- Digging Dimensions If t) ------------- <br />I U.S. Hetric I Length Width Height ~ Naz. Reach I IIaz.Dig I IIaz.Load 1 Haz.Yertical I <br />Ilachine Description Tans Tons I (ftl Ift) If t) I Ground Level ~ Depth ~ Height .Reach Height <br />CAT 205 (19861 14.48 13.13 23.92 1.83 9.83 25.25 16.33 15.22 22.17 <br />------------------------------------- ---------------- -----------------------------------------------------------I <br />-- Itazimum Lifting Capacity (lbsl -.-Bucket Capacity (heaped cu.yd.)-. Ilan. Travel I Horsepower ~ Fuel I Chassis <br />At Opt. Lift Pt. At Haz. Reach ~ Ilinimum Ilid-Range laazimum~ Speed (oph) . (fhpl I Type Type <br />~- <br />7,800.00 2,000.00 0.36 0.14 1.04 2.50 53 Oiesel trac~a <br />1 \~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.