My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC24795
DRMS
>
Back File Migration
>
Inspection
>
INSPEC24795
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:24:26 PM
Creation date
11/18/2007 9:57:14 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981048
IBM Index Class Name
Inspection
Doc Date
7/21/1995
Doc Name
COAL INSPECTION REPORT
Inspection Date
7/20/1995
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
III. COMMENTS -COMPLIANCE <br />Below are comments on the inspection. The comments include discussion of observations made <br />during the inspection. Comments also describe any enforcement actions taken during the <br />inspection and the facts or evidence supporting the enforcement action. <br />This was an partial inspection of the Trinidad Basin Mine for the month of July, 1995. <br />The main purpose of this inspection is to verify that all work for the repair of the reconstructed <br />stream channel is complete and in accordance with the contract. <br />The channel has been installed to designed specifications and all riprap is in place. Riprap at the <br />entrance to Delagua Canyon has been grouted in as designed. Water bars and rock check dams <br />were installed as designed. All work has been completed IAW with the cotract and no further <br />work is necessary. <br />
The URL can be used to link to this page
Your browser does not support the video tag.