Laserfiche WebLink
;- <br />U. S. DEPT. OF THE INTERIOR <br />OFFICE OF SURFACE MINING <br />Mine Site Evaluation <br />State Program <br />]. Pennittee/Person 9. Permit Ntm~ber 10. Permit Type <br /> KAISER RESOURCES, INC. C-023-81 PP <br /> 2. Address ~ 1 L Field Visit Date 72. Purpose 13. SRA Present <br /> PO BOX 396 10/17/2002 OBR <br />3. City 4. State mm-dd -yyyy <br /> <br />CO 14. Permit Status 15. Site Status 16. Facility Type <br />Paoosa S rings IN MC <br />~. Zip Code 6. Phone Number <br /> 17. OSM Office # 18. CCID # 19. Land Code <br />81147 (619)392-4257 <br />40 ~ SF <br />7. Operator Name, if Different than Pernittee 1 <br /> 20. M.S.H.A ID N 21. State Abrev. 22. County Name <br /> RC <br /> HOLET <br />OS-03033 CO A <br />8. Mine Name <br /> 23. AVS Pennittee Entity ID Number 24. State Office <br />CHIMNEY ROCK MINE <br /> 104620 <br />25. Hours <br />1 <br />p a <br />Permit Review 26. Si~nat a Block <br />/~~~ ~'i 27. Reviewin Official: <br />~ ~ G;f <br />, <br />. , ,~ <br />x <br /> Signahue: Signature: <br /> 0 <br />2 b. Site Visit Time <br /> , RANDY PAIR ID # 997 <br />t <br />1].0 c. Travel Time <br />Printed Name: Review Date: ~/ 111~/2~d <br />Z <br /> mm - dd - yyyy <br />2,0 d. Report Writing Date: ] 1/01/2002 Is Supplemental MSE Page Used Y/N~ <br />Permit Type -Item 10 IP =Interim Program, PP =Permanent Program , NP = No Permit <br />Purpose Type Codes Item 12 CCR....Citizen Complaint Referral (non site visit) <br />pxx....Oversight RFx.... Reclamation Fees CC...... Citizen Complaint (initial site visit) <br />Axz.... Assistance Fxx..... Federal Actions CCF.... Citizen Complaint Follow-up <br />Joint Inspection -Item 13 A joint inspection is when a state inspector accompanies an OSM inspector any time during the review of the mine site. <br />Permit Status -Item 14 AB....Abandonetl: All surface and underground coal mining activities have ceased and <br />operator has left the site without completing reclamation as defined in <br />A.... Active: Coal mining and reclamation activities occurring or 30 CFR 840.17(8) <br />permitted but not yet disturbed. A81..Bond Forfeiture: Bond forfeiture officially in process or completed, and. <br />IN....Inactive (Permanent Program Permit): Phase II completed or reclamation in progress or not yet commenced. <br />Temporary Cessation of Operations. (Interim Program Permit) gg2..Partially Reclaimed Forfeiture: Forfeited site where all bonds have been <br />Coal mining completed and reclamation activities initiated. used to reclaim site, but site not reclaimed to Program standards. <br />BR... Bond Release: Reclamation completed and State Regulatory AB3..Reclaimed Forfeiture: Forfeited site chat has been reclaimed to Program standards. <br />Authority (RA) has released all of the bond (Phase III Release.) NA... Not Applicable: When site is unpermitted. <br />Site Status Codes -Item 15 NS.. Non-Site Visit: Status of site not determined. <br />ND...No Disturbance: No coal mining and reclamation MC_Mining Complete: No mining activity on site, FP.. Forfeiture Pending: The RA is pursuing <br />operations have been started. site regraded and avraiting pphose bond release. actions to revoke the permit, collect the <br />EX.. Coal Exploration: Coal exploration operations TC..Tempgrary Cessation: The RA has ggranted performance bond(s), and/or reclama- <br />have started and where coal mining operations cessation of mining pursuant to 30 GFR 816/ lion of forfeited site is in progress. <br />have not begun. 817.131(b). FR.. Forfeited and Reclaimed: Forfeiture <br />I RR <br />ti <br />d <br />C <br />l <br />rf <br />i <br />i <br />P1 <br />Ph <br />l <br />At ( <br />t <br />I b <br />d <br />ve Coal Pro <br />ucing: <br />oa <br />su <br />ace m <br />n <br />ng <br />... <br />ase <br />e <br />ease: <br />eas <br />Phase <br />on <br />AP.. Ac <br />release reclamation completed. <br />activities are occurring. granted for enfire permifted area. For inferim FO_ Abandoned Site: Abandoned site that <br />AN.. Active Non-Producing: Active non-producing permits, partial bond release. is permitted but there is no bond. <br />facility such as tipple or preparation plant. P2.. Phase II Release: At least Phase II bond release WC. Wildcat: Coal mining and reclamation <br />NM..No Mining: The Permit Status is active, site is for the entire permitted area. operations have or are taking place and <br />not in Temporary Cessation, no surface coal P3.. Phase III Release: Reclamation completed and the activity is not covered by the <br />minin activit ,and site not re raded. the RA has released all bond. required permits from the RA. <br />Facility Type Codes - Item i6 D...Ancillary (Haulroad, Conveyor, and/or Rails) H...Exploration Permits L._ Remining site permitted <br />A... Surface E... Refuse and/or Impoundment I... Notice of Intent to Explore under 30 CFR785.25 <br />B... Underground F... Loading Facility and/or Tipple J... Exempt 16 and 2!3 <br />C... Preparation Plant G... Stockpiles K... Government Financed Construction Exemption <br />Small Business Regulatory Enforcement Fairness Act (SBREFA) <br />Your Comments Are Important <br />The Small Business and Aericnlture Regtilatory Enforcement Ombudsman and 10 Reeional Fairness Boards were established to receive comments frm <br />small businesses about Federal aeeney enforcemcnt actions. The Ombudsman will annually evaluate the enforcement activities and rate each aeencv's <br />- <br />responsiveness to smal l business. <br />If you are a small business (a business with 500 or fewer employees including those of atHliates) page ] of -~ <br /> <br />and wish to eotnment on the enforcement or compliance activities of OSM, call I-RRR-REG-FAIR (1-R8R-7343247). x<~;:<a o«e~,n~~a. ~ ox <br />§ <br />