Laserfiche WebLink
<br />CIRCES Estimating Software <br />EARTHWORK FORM -BULLDOZER WORK <br />PROJECT IDENTIFICATION <br /> Agency or organization name : DMG <br /> <br />Task A: 004 Stale: Colorado permiUjob#:M-77-284 <br />Dale: 03/tA99 County: Monbose Abbreviation :none <br />User : WHE Sile :Mineral Jce Filename : M284004 <br /> <br />Perm it or clherjob action :General 110(2) bond review <br /> <br /> Task description :Slope retlucaon !or'highwalls' at /oadout and portal <br /> <br />HOURLY E QUIPMENT COST Basic machine:Cat OBN (1996) Horsepower: 28: <br /> Blade type :Semi-Universal <br /> Attachment >R1 :ROPS Cab Shift hasis; 1/tlay <br /> Attachment 112 :3-shank ripper <br /> Utilization % (CRG) <br /> Cost Breakdown : Ownership S/hour: E43.aB NA <br /> Operating S/hour: $54.94 100 <br />Ripper op.yhour : Ef.77 <br />Operator S/hour: $23.12 <br />Tclal unit S/hour : 4122.90 <br />MATERIAL QUANTITIES <br />Initial <br />volume : 1,390 LCY <br />Swell <br />(actor: NA <br />25 <br />Total fleet $/hour : $122.90 <br />Loose <br />volume : 1,390 LCV <br />Source o(quantiry lake-o0: See attached, 'Drawing 2'end'Dmwing 3' <br /> <br />Source o(est. swell factor : NA <br /> <br />HOURLY PRODUCTION <br /> Job Condition Correction Factors <br />Avg. push distance: 50 feet <br /> Operator skill : 0.75 (avg.) <br />Unadjusted hourly Material consistency : 0.90 (CAT HEI) <br />dozer production : 1180 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility: 1.00 (avg.) _ <br />Material consistency description : Job elficienq : O.B3 (1sh/day) <br />Comnacfetl all or embankment Spoil pile 080 (InddJ <br />Avemge push gradient : 5.00 % (negJ <br />Average site altitude : 6,000 feet <br />Material weight : 2,650 Ib/LCY <br />Material weight description <br />Decomposed rock - 25% Rock, 75% Earth <br />JOB TIME 8 COST <br />FIee1 size : 1 Dozers) <br />Unit cost $0.240 /LCY <br />Push gmdient : ].11 (CAT HE~f <br />Altitude : 1.00 (CA T HE:) <br />Material weigh) : 0.87 (GAT HE/ <br />Blade type : 1.00 (S or U) <br /> <br />Net correction : 0.43 <br />Adjusted unit production : 511.60 LCY/hr <br />Adjusted Oeel production : 511.60 LCY/hr <br />Total joh lime' 2.72 Hours <br />Total job cost ~ $334 <br />