My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC24745
DRMS
>
Back File Migration
>
Inspection
>
INSPEC24745
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:24:24 PM
Creation date
11/18/2007 9:57:02 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977284
IBM Index Class Name
Inspection
Doc Date
3/22/1999
Doc Name
RECLAMATION COST SUMMARY FORM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RECLAMATION COST SUMMARY cont'd sheet 4 of 4 <br />K. PORTAL(SHAFT SEALING <br />Task No.l Task Description ~ Cost (E) <br />________I______,._______________,.___________________________I____________ <br />2 ~ Close mine openings ~ ~ E2,703 <br />Subtotal (K): E2,703 <br />L. DRILL HOLE/MONITORING wE LL SEALING <br />Task No.~ Task Description <br />________I______________________~___________ <br />NA ~ Not indicated <br />M. MISCELLANEOUS RECLAMATION TASKS <br />Task No.~ Task Description <br />Cost (E) <br />Subtotal (L): <br />Cast (E) <br />1 ~ Demolition per attached task 1 worksheet ~ E8, 166 <br />7 ~ Seeding per attached task 7 worksheet ~ E4,554 <br />NA I Fencing no[ required at [his time <br />8 ~ Mob/Demob per attached task 8 worksheet ~ E1,866 <br />Subtotal (M ): 514,586 <br />TOTAL DIRECT RECLAMATION COSTS (subtotals A Through M): 523,322 <br />II. INDIRECT COSTS <br />A. CONTRACTOR'S OVERHEAD 8 PROFIT <br />Item No.~ Item Description ~ Lost (E) <br />________I______________________~_______________,.___________I____________ <br />1. ~ Public Liability Insurance.... 1.SSOX of dir. ~ E361 <br />2. ~ Contractor's Performance Bond 1.SSOX of dir. ~ E361 <br />3. ~ Contractor's Profit........... 10.OOX of dir. ~ E2,332 <br />4. ~ Job Superi ntendent.. per attached task 9 worksh eet~ E3,552 <br />Subtotal (A ): E6,608 <br />TOTAL CONSTRUCTION CONTRACT AMOUNT (direct plus 0 8 P): E29, 930 <br />B. DMG PROJECT ADMINISTRATION E%PENSES <br />Item No.~ Item Description ~ Cost (E) <br />1. ~ Minerals Program Admin. Fee at 5.00% of cnt r.~ E1,496 <br />NET INDIRECT COST PERCENTAGE: 34.75% Subtotal (B): E1,496 <br /> <br />TOTAL INDIRECT __________ __ <br />RECLAMATION COSTS (subtotals A through B): __________ <br />E8, 104 <br />TOTAL PERFORMANCE BOND AMOUNT (direct plus indirect costs): E~1,426 <br />
The URL can be used to link to this page
Your browser does not support the video tag.