Laserfiche WebLink
ROADABLE EWIPMENT: <br />Total Eqp. Fleet Size Heul Trip Return Trip <br />Machine~Descriptian Cost/hr (no. hauled) Cost/hr Cost/hr <br />Subtotals f0.00 f0.00 <br />MOB/DE1108 SUPPORT EQUIPMENT: - <br />Mon-Roadeble Eq.+. Description <br />sheet 2 of 2 <br />Yeight Cwrership Nsul RiB Fleet Size Xaul Trip Return Trip DOT Permit <br />(taro) Cost/hr Cost/hr (no. hauled) Lost/hr Cost/hr Cost/ea <br />s_-eaeve_=-vv_= ~ v _=c s --••,•_-seen-_-oe_ -- _,a :~_ <br />Subtotals 10.00 50.00 ~ 50.00 <br />Total Eop. Fleet Sixe Haul Trip Return Trip <br />Roedeble Eqp. Description Cost/hr (no. hauled) Cost/hr Cost/hr <br />_~~~emo~=e~_ ===='z'- _=___-===__ ='====_=_v <br />6L ~9~ ~J' C-~T~ C5 T S9~ i 3 <br />Subtotals ~ f0.00 50.00 <br />EDUIPMENT HAUL DISTANCE L.T [NE <br />Nearest major city or town within project area region: Brighton <br />0.50 hours load <br />0.33 hours heal <br />0.50 hour rnloed <br />0.33 hours return <br />Total as way travel distarce = 10.0 miles. Average travel speed = <br />Job Time - Man Roedeble Equip. <br />JOB COST <br />Roedable Equip.= <br />Total Mab/Dermb Cost ~ f3,111.91 <br />30.00 nQh. <br />N/A hours losd <br />0.33 hours haul <br />M/A hours unload <br />0.33 hours return <br />MOTE: Non•roedeble equipment (haul rig required to transport) mob/denmb costs based on 2 round trips, each trip <br />caroistinB of a one-way loaded haul and a one-way enQty return. Roadable equi Anent (m haul rig required) <br />eosea based on one round trip. Colorado DOT requires special permits for oversize equipment on certain <br />speclf iad road segments within the State. separate permits ere required for each rig on each loaded trip. <br />Additi orally, pilot cars (one or two per rig deperdirg an degree of oversize) ere also required for oversize <br />equipment hauling, erd loath ngMloedirxJ tines mrst be trcreesed substantially for equi Anent which mts[ be <br />partially dismm~tled for transport end re-assembled et the job site. Costs for littirg equipment and other <br />support eoHipnent needed for this work should be ircluded in the mob/demob costs. <br />