Laserfiche WebLink
• • <br />RECLAMATION COST SUMMART con['d sheet 4 of 4 <br />K. PORTAL/SHAFT SEALING <br />Task Mo.~ Task Description I Cost (f) <br />Subtotal (K): <br />____________ <br />L. DRILL HOLE/MONITORING YELL SEALING <br />Task No.~ Task Description ~ Cost (f) <br />_I____ __~_ __.__~____I_______.____ <br />Subtotal (U: <br />____________ <br />M. MISCELLANEOUS RECLAMATION TASKS <br />Task No.~ Task Description ~ Cost (f) <br />11 ~ Dereterirg ~ 522,600 <br />Demolition <br />3 ~ Seedirp ~ 574,704 <br />Fencing <br />5 ~ Mob/Denpb ~ 53,112 <br />Subtotal (M): (40,416 <br />TOTAL DIRECT RECLA)UT70N COSTS (subtotals A throupH M): (79,581 <br />II. INDIRECT COSTS <br />A. CONTRACTOR'S OVERHEAD i PROFIT <br />Itw No.~ Itea Description ~ Cost (f) <br /> <br />1. ~ Public Liability Insurance.... 1.550% of dir. ~ -_ <br />(1,234 <br />2. ~ Contractor's Performance Band 0.975% of dir. ~ f776 <br />3. ~ Cantreetor's Profit........... 70.00% of dir. ~ (7,958 <br /><. ~ Job Superintendent.. <br />TOTAL CONSTRUCTION CONTRACT AMOUNT (direct plus 0 i P):~ 589,548 <br />____________ <br />B. DNG PROJECT ADMINISTRATION EXPENSES <br />Item No.~ Item Description ~ Cost (5) <br />___- I .____~ ~ ______~__ <br />1. ~ Minerals Program Ada S.OOX of cntr.~ 54,477 <br />MET INDIRECT COST PERCENTAGE: 18.75% Subtotal (B): f4,477 <br />TOTAL INDIRECT RECLAMATION COSTS (subtotals A through B): f14,445 <br />TOTAL PERFORMANCE BOND AMOUNT (direct plus indirect costs): 594,026 <br />