Laserfiche WebLink
III. COMMENTS -COMPLIANCE <br />Below are comments on the inspection. The comments include discussion of observations made during the <br />inspection. Comments also describe any enforcement actions taken during the inspection and the facts or <br />evidence supporting the enforcement action. <br />This permit is in temporary cessation. There is no operational, other than occupation of the office <br />building and routine maintenance, activity at the site. <br />Signs and Mazkers <br />Permit identification and boundary signs were in good repair. The north topsoil pile mazker had been <br />reset. <br />Hydroloeic Balance <br />There was no discharge from Sedimentation Ponds 1 and 2. There were no surface inflows to the <br />ponds. <br />Backfill and Gradine <br />Remaining backfilling and grading requirements aze associated with long-term facilities. No <br />reclamation backfilling and grading have been accomplished at the site. <br />Sunnort Facilities <br />The office building and trailer are occupied and are in good repair. Sedimentation ponds and ditches <br />are in good repair. Other structures are in disrepair. Some structures have been vandalized. Temporary <br />repairs have been made. <br />To soil <br />Replacement of topsoil is associated with the future reclamation of long-term facilities. Topsoil storage <br />piles were stable and protected by vegetation. <br />General Mine Plan Compliance <br />The site is in temporary cessation. No permitted work to covert the site from a coal load-out to a coal <br />load-in facility had been accomplished. <br />Revegetation <br />Remaining revegetation requirements aze associated with future reclamation of long-term facilities. No <br />reclamation revegetation has been accomplished at the site. <br />Air Resource Protection <br />The site is stable with regard to air protection. There is no dust-generating activity at the site. <br />C-1992-081, CP inspection of 7 June 2007, page 3 of 5 pages <br />