My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC24266
DRMS
>
Back File Migration
>
Inspection
>
INSPEC24266
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:24:00 PM
Creation date
11/18/2007 9:54:21 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
Inspection
Doc Name
Inspection report
Inspection Date
8/26/2002
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
III. COMMENTS -COMPLIANCE <br />Below are comments on the inspection. The comments include discussion of observations <br />made during the inspection. Comments in Section IV describe any enforcement actions <br />taken during the inspection and the facts or evidence supporting the enforcement action. <br />This was a special visit to attend a meeting and inspect alternate light-use road alignments up <br />Sylvester Gulch. The meeting was held at the offices of the US Forest Service. In attendance at <br />the meeting were Susan J. Spear, Llane Mattson, Kim KaB, and Doug Marah of the US Forest <br />Service; Phil Schmidt, Henry Barbe and Wendell Koontz of West Elk; David Finnerty of Thunder <br />Basin; Chuck Chesnik, contractor; and Byron Walker, CDMG. <br />Ms. Spear opened discussion on the alternatives. West Elk then presented a discussion of <br />alternatives, followed by a discussion by CDMG (Walker presented an overview of the <br />Interoffice Memorandum_to Jim Burnell, from Byron G. Walker, subject Request for Support, Light- <br />Use Roads, West Elk, dated August 22 2002, included herein by reference). This memo was edited <br />August 28, 2002 and redistributed to Mr. Burnell, and to Mr. Barbe and Ms. Speaz by a-mail. This was <br />an open, informal meeting with questions, answers and comments provided by various attendees <br />thought the meeting. <br />The meeting did not conclude with a selected alternative. Pros and cons of alternatives were <br />discussed, with the conclusion that adjustments and refinements were required. Another <br />meeting was proposed. <br />As no alternative was selected, and due to the late hour, no field inspection was made of any <br />of the routes. <br />C-80-007, Page ~ of ~r Pages, (date) Z 8 ~~s o Z (initials) ---~~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.