Laserfiche WebLink
NI IIIIIIIIIIIIIIII <br />~T; ~~. DEpT. OF THE INTERIOR <br />QFFICE OF SURFACE MINING <br />~{/ Mine Site Evaluation <br />$~~~~ogram <br />a~ <br />~: <br />~FOFSU~~~ <br />1. PermitteelPerson 9. Permit Number f0. Permit Type <br />HAYDEN GULCH TERMINAL, INC. C-08I-92 PP <br />2. Address Field Visit Date 12. Purpose 13. SRA Pcesenl <br />P, O. BOX 774018, JOHN WE t N M q!-/ 07/21/2000 ~ ~J <br />3. City -, ' 4. State mro ' dd ' YriY <br /> <br />CO 14. Permit Status <br />_ 15. Site Status l6. Facility Typ <br />` <br />Steamboat Spr. [ <br />• ~ AN r~ <br />1 <br />5. Zt Code 6. Phone Number <br />80477 {970}879-6260 17. OS IM Offsce # <br /> <br />lao 18. CCID # 19. Land Code <br />7. O erator Name, if Different than Perntittee <br />N <br />22 <br />C <br /> 20. M.S.H.A ID # 21. State Abrev, ounty <br />am <br />. <br />SENECA COAL CO. CO ROUTT <br /> <br />8. Mine Name <br />23. AVS Permittee Entity 1D Number <br />24. State Offce <br />HAYDEN GULCH LOADOUT <br />129412 <br />25. Hours 26. Sig ture Block 27. Reviewin Oft`icia <br />1.0 a. Perini[ Review <br /> <br />2 <br />0 <br />b. Site Visit Time Sig a re: ~/y Ov Signature: <br /> , HENRY A STIlV ID # lI6 <br />~ <br />f? <br />1.0 c. Travel Time Printed Name: y 2 Vt} <br />Review Date: ~ I <br />mm - dd - yyyy <br />1,0 d. Repott Writing Date: 08/08/2000 Is Supplemental MSE Page Used Y/N C <br />Permit Type -Item 10 IP =interim Program, PP .Permanent Program , NP = No Permit <br />Purpose Type Codes Item 72 CCR... Citizen Complaint Refena! (non site visit) <br />per,,, Oversight RFx..., Reclamation Fees CC...... Cifzen Complaint tnldal site Nsltj <br />Axx..,, Assistance Fxx..... Federal Actions CCF....Citizen Complaint ~dlow-up <br />Joint Inspection -Item 13 A joint inspection is when a state inspector axompanies an OSM Inspector any time during the review of the mine site. <br />Permit Status -Rem 14 A13....Abandoned: Aft surface and underground coat mininng~ activities have ceased ant <br />A..:: Active: Coal mini and reclamation activities occurri or operator has left the site without completing reclamation as defined in <br />n9 n9 30 CFR 840.1 t (g <br />ppeemdtted but not yet disturbed. Af31.. Bond Forfeiture: forfeiture olficialiy in process or completed, and. <br />IN....lnactive (Pemsanent Proroggr~am Permit): Phase U completed or reclamation ui prograsa or not yet commenced. <br />Temporary Cessaton otDperations. (interim Program Pemut} A82..Pardaly Reclaimed Forfeiture: Forfeited site where all bonds have been <br />Coal inning completed and reclamation activities initiated. used to reclaim site, but site not reclaimed to Progrsrrt standards. <br />f3R...gond Release: Redamadon coinplaced and State R ulatory Ali3..Reclaimed Forfeiture: Forfeited site that has been reclaimed to Program stanch <br />Authority (RA} has released alt of fialfi bond (Phase Il~elease.} NA...Not Applicable: When site is unpennitted. <br />Site Status Codes -Item 15 NS.. Non-Site Visit: Status of site not detennir <br />ND...No Disturbance: No coal mining and reclamation MC..Minirg Complete: No mining activity on site, FP.. Forteiture Pending: The RA Is pursuing <br />operations have been started. site regraded and awaiting phase bond release. actions to revoke the perrnii, collect the <br />EX..Coat Exploration: Coal exploration operations TC..Temporary Cessation: The RA has granted ppeerformance bond(s), artdlor redama- <br />have started and where coat mining operations cessation of mining pursuant to 30 CFR 8tti/ tisn of forfeited site is to progress: <br />have not begun. 817.131(b). FR.. FvAeited and ReGaimed: Forfeiture <br />AP.. Active Coal Producing: Coal surface mining P1...Phase E RRelease: At (east Phase t bond release reclamation completed. <br />activities are occumng. ranted for entire permitted area. For interim FO.. Abandoned Site: Abandoned site that <br />AN., Activo Non-Producing: Active non-producing $emvts, partial bond release. is rmitted but there is no bond. <br />tacit~'~ttyy such as tipppple or preparation plant. P2.. Phase 11 Release: At least Phase 11 bond release WC. ~idcaL• Coal mining and reclamation <br />NM..No Wining: The F'ennit Status is active, site is br the entire permitted area, operations have or are talung place and <br />not in Temporary Cessation, no surface cost P3.. Phase NI Release• Reclamation completed and the activity is not covered byy the <br />mining activity, and site not regraded. the RA has released ad bond. required permits from the RA. _ _ <br />Facility Type Codes -Item t6 p,,,Aricittary (Haulroad, Conveyor, andfa Resits) H...Exploration Permits 1... Remtning site permiK~ <br />A... Surface E... Refuse and/or Impoundment 1... Notice of Intent to Explore under 30 CFR785.25 <br />8... Underground F.., load(nngg Faaliy and/or Tipple J... Exempt 16 and 2/3 <br />C... Preparation Plant (i..,StodcMles K.,.Govemment Financed Construction Exemption <br />Small Business Regulatory Enforcement Fairness Act (SBREFA} . <br />Your Comments Are Important <br />Tire Small Business and Agriculture Regulatory Enforcement Ombudsman and 10 Regional Fairness Boards were established to receive comments frc <br />small businesses about Federal agency enforcement actions. 'file Ombudsman will annually evaluate the enforcement activities and rate each artencv' <br />