Laserfiche WebLink
III. COMMENTS -COMPLIANCE <br />Below are comments on the inspection. The comments include discussion of observations made <br />during the inspection. Comments also describe any enforcement actions taken during the <br />inspection and the facts or evidence supporting the enforcement action. <br />treat any infestations on their property. <br />The inspection continued at pond A and B. Both were dry and the <br />operator is preparing to install the catwalk to the primary <br />discharge control on pond B. This pond is also scheduled to have <br />excess sediment cleaned out in the near future. <br />Both Bear Canyon and Hubbard Creek sites were inspected and no <br />problems were noted. The vegetation at the lower portal at Hubbard <br />Creek is not establishing very well, however, this area is slated <br />to be reseeded with the permanent mix this year. The operator is <br />planning to conduct some soil sampling to insure proper chemical, <br />physical and fertility levels. <br />Roads on the site were in good condition, however, the intersection <br />of highway 133 and the mine entrance should be cleaned up as excess <br />coal fines and general road grime have built up in this area. <br />The mine site is generally in good working order with non-coal <br />waste properly contained in the non-coal waste area and mining <br />supplies neatly stored. <br />The records were checked and found to be in compliance with <br />Division requirements. <br />