Laserfiche WebLink
` In reference to N17 above: All samples collected <br />at discharge site 001 have been in compliance; <br />however the decant from pond #3 has not been <br />sampled because entity did not consider the <br />groundwater decant a wastewater discharge. <br />20. Person(s) Interviewed: George Gregg <br />Title: General Manager <br />21. CDH Engineer/Tech:Jess Vann(970)248-7155 <br />