My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC24055
DRMS
>
Back File Migration
>
Inspection
>
INSPEC24055
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:23:50 PM
Creation date
11/18/2007 9:53:22 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977023
IBM Index Class Name
Inspection
Doc Name
WASTEWATER INSPECTION REPORT
Inspection Date
3/23/1995
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
l <br />trial Wastewater <br />Inspection Report <br />SECTION A: NATIONAL DATA SYSTEM CODING <br />Trans Code CDPS/NPDES Date <br />N 5 COG-500010 03/23/95 <br />Fac Eval BI QA County <br />3 N 26 <br />SECTION B: FACILITY DATA <br />1. Legally Responsible Party: <br />Mailing Address: <br />Business Phone: <br />Emergency Phone: <br />Legal Representative: <br />2. Operating Company: <br />Mailing Address: <br />Business Phone: <br />ESnergency Phone: <br />Local Facility Contact <br /> <br />Insp Type Inspector Fac Type <br />C S 2 <br />Operator Plant Class <br />None <br />Thomas E. Brubaker, President <br />P.0. Box 550 <br />Rocky Ford, CO 810670000 <br />(719)254-7464 <br />( ) - 0 <br />Thomas Brubaker, President <br />Valco, Inc. <br />P.0. Box 837 <br />Gunnison, CO 812300000 <br />(970)641-0951 <br />(970)641-6915 <br />George Gregg, General Manager <br />3. Has any of this information changed since the last inspection? Y <br />4. County in which facility is located: Gunnison <br />5. Plant Products: Sand, Gravel, Aggregates, Concrete <br />Present Production Rate: UKN <br />Design Production Rate: UKN <br />Raw Materials: Sand, Gravel, Aggregate, Cement Binder <br />SECTION C: AREAS EVALUATED DURING INSPECTION <br />6. Briefly describe the process steps used in producing the product. <br />Include a process flow diagram and a discussion of chemicals used at <br />the site and their final disposition. State the final disposal of <br />wastewater streams. <br />Sand and Gravel are mined from river alluvial <br />material. Sand and gravel are washed on site. <br />Wash water is directed to a settling pond. Batch <br />concrete is produced on site. <br />7. What containment does the permittee have for materials used, processed <br />or stored on site? <br />III III III IIIIIIIIII <br />Fuel is stored on site inside of a stock tank that <br />is sized for containment. <br />
The URL can be used to link to this page
Your browser does not support the video tag.