|
i
<br />~o~
<br />
<br />. ~ MO UNTAIN COAL COMPANY, L.L.C. -WEST ELK MINE
<br /> LOWER REFUSE PILE - MONITORING SU RVEYS
<br /> RECEIVED
<br /> T
<br />T ~ R ~ ~~ T.I ~~ .4~YY ~
<br />_
<br />..
<br />SURVEY 57 ..
<br />~ e ...,
<br />SURVEY 58
<br />SURVEY 59 r~
<br />_
<br />6
<br />0
<br />_ P
<br />a ~s 8Y
<br />at~
<br />Point point Point Se
<br />o
<br />~
<br />i
<br />oint
<br />'61 'B1 '61 'B1
<br />B2 N 404,251.090 B2 404,251.128 B2 B2
<br /> E 1,448,643.984 1,448,643.950
<br /> EL 6,147.5 6,147.5
<br />B3 N 404,288.223 B3 404,288.209 83 B3
<br /> E 1,448,550.691 1,448,550.755
<br /> EL 6,146.4 6,146.5
<br />B4 N 404,321.046 84 404,321.045 B4 B4
<br /> E 1,448,456.658 1,448,456.663
<br /> EL 6,144.9 6,144.991
<br />BS N 404,350.731 BS 404,350.765 BS B5
<br /> E 1,448,361.182 1,448,361.231
<br /> EL 6,144.9 6,144.9
<br />B6 N 404,376.861 B6 404,376.918 B6 86
<br /> E 1,448,265.054 1,448,265.054
<br /> EL 6,143.2 6,143.2
<br />B7 N 404,400.779 B7 404,400.959 87 B7
<br /> E 1448,168.030 1,448,168.315
<br /> EL 6,141.6 6,141.6
<br />B8 N 404,417.377
<br /> E 1,448,069.266
<br /> EL 6,137.9
<br />B9 N 404,433.938
<br /> E 1,447,971.141
<br /> EL 6,131.6
<br />810 N 404,449.555
<br /> E 1,447,874.284
<br /> EL 6,1252
<br />B71 N 404,465.823
<br /> E 1,447,775.852
<br /> EL 6,118.0
<br />' This point was destroyed by the
<br />68 404,417.357 B8
<br /> 1,448,069.268
<br /> 6,137.9
<br />B9 404,433.846 B9
<br /> 1,447,971.181
<br /> 6,131.6
<br />810 404,449.627 870
<br /> 1,447,874.363
<br /> 6,125.2
<br />871 404,465.797 811
<br /> 1,447,775.935
<br /> 6,118.0
<br />iew road construction during Septemb er, 1991, and will not be reset.
<br />B8
<br />B9
<br />B70
<br />811
<br />09/07/00 1.46 PM II
<br />Irplbl.doc
<br />
|