My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC23973
DRMS
>
Back File Migration
>
Inspection
>
INSPEC23973
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:23:45 PM
Creation date
11/18/2007 9:53:01 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1984065
IBM Index Class Name
Inspection
Doc Date
4/25/2003
Doc Name
OSM Inspection Report
From
OSM
To
DMG
Inspection Date
4/15/2003
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
U. S. DEPT. OF THE INTERIOR <br />OFFICE OF SURFACE MINING <br />Mine Site Evaluation State Program <br />Permittee/~~ Permit ~ Field Visit <br />Person NCIG FINANCIAL, INC. Number C-065-84 Date 04/15/2003 Continuation Page <br />28. Performance Standard Categories <br />Codes: 1=Compliance, 2=Noncompliance, 3=Not Planned, 4=Not Started, S=Noncompliance Identified sewhere, 6=Previously Cited <br />1. 1 Mining within Valid Permii <br />2. 1 Mining within Bonded Area <br />3. 1 Terms & Conditions of Permit <br />4. 1 Liability Insurance <br />5. 1 Ownership and Control <br />6. 1 Temporary Cessation <br />7. 1 AML Rec. Fees -- Non-Respondent <br />$. 1 AML Rec. Fees -- Failure to Pay <br />B. Hydrologic Balance <br />1. 1 Drainage Control <br />2. 1 Inspections & Certifications <br />3. 1 Siltation Structures <br />4. 1 Discharge Structures <br />5. 1 Diversions <br />6. 1 Effluent Limits <br />7. 1 Ground Water Monitoring <br />8. 1 Surface Water Monitoring <br />9. 3 Drainage -- Acid-Toxic Materials <br />10. 3 Impoundments <br />11. 3 Sueam Buffer Zones <br />C. Topsoil & Subsoil <br />1. 3 Removal <br />2. 1 Substitute Materials <br />3. 1 Storage and Protection <br />D. Backfilling & Grading II. 3 Subsidence Control Plan <br />1 . 1 Exposed Openings I. Roads <br />2 . 1 Contemporaneous Reclamation 1. 1 Road Construction <br />3 .~ Approximate Original Contour 2, 1 Certification <br />4 . 1 Highwall Elimination 3. 1 Drainage <br />5 . 3 Steep Slopes (includes downslope) q. 1 Surfacing and Maintenance <br />6 . 3 Handling of Acid &. Toxic Materials 5. 3 Reclamation <br />7 . 1 Stabilization (rills and gullies) J, Signs & Markers <br />E. Excess Spoil Disposal I. 1 Signs <br />1 . 3 Placement 2. 1 Markers <br />2 . 3 Drainage Convol I{, 1 Distance Prohibitions <br />3 <br />4 . 3 Surface Stabilization <br />. 3 Inspections & Certifications <br />L. Reiegetation <br />1. <br />Vegetative Cover <br />F. C oal Mine Waste _ <br />2. 1 Timing <br />1 (Refuse Piles/Impoundments) <br />. 3 Drainage Control M, 1 Postmining Land Use <br />2 . 3 Surface Stabilization N, Other <br />3 . 3 Placement General <br />4 . 3 Inspections and Certifications Performan ce <br />5 . 3 Impounding Structures CatagOry <br />G. U se Of Explosives 1) <br />1 . 3 Blaster Certification _ <br />2 . 3 Distance Prohibitions 2) <br />3. 3 Blast Survey/Schedule _ <br />4. 3 Warnings & Records 3) <br />5. 3 Control of Adverse Effects _ <br />A. <br />B. <br />C <br />D <br /> Performance Standard Categories <br /> 30 CFR Counterpart <br /> Administrative .................................. ....................................... <br />1. Valid Permit .................................................... .................................773.11 <br />2. Mining within Bonded Area .................. ..............................773.11 <br />3. Terms & Conditions of Permit ............... ..............................773.17 <br />4. Liability Insurance .................................. ..............................800.60 <br />5. Ownership and Convol ........................... .............................778.13 <br />6. TemporaryCessation .............................. 842.11(e)&8]6/817.131 <br />7. AML Rec. Fees -- Non-Respondanr ...... .........................870.15(6) <br />8. AML Rec. Fees -- Failure to Pay ............ .........................870.15(a) <br />Hydrologic Balance ................................»....(816/817.41-57) <br />1. Drainage Convol .................................... .....................................45 <br />2. Inspections &Certifications ................... ..........................49(a)(10) <br />3. Siltation Structures ................................. .....................................46 <br />4. Discharge Structures .............................. .....................................47 <br />5. Diversions ............................................... ....................................43 <br />6. Effluent Limits ....................................... .....................................42 <br />7. Ground WaterMonitoring ...................... ................................41(c) <br />8. Surface Water Monitoring......_._ .......... .............._.................41(e) <br />9. Drainage--Acid -Toxic Materials .......... .................................41(f) <br />10. [mpoundments ........................................ ....................................49 <br />11. Stream Buffer Zones .............................. .....................................57 <br />Topsoil &Subsoil ...............................................(816/817.22) <br />1 . Removal ................................................... ...............................22(a) <br />2. Substim[e Materials .................................. ...............................22(c) <br />3. Storage and Protection .............................. ...............................22(c) <br />4. Redistribution ........................................... ...............................22(d) <br /> Backfilling & Grading ...................... ........(816/817.95-107) <br />1. Exposed Openings .....................81N817.1 3, t4, 15, & 823.11 & 21 <br />2. Contemporaneous Reclamation ................. .................................100 <br />3. Approximate Original Contour ................. ........................102(a)(1) <br />4. Highwalt Elimination ................................. ........................102(a)(2) <br />5. Steep Slopes (includes downslope) ............ ................................107 <br />6. Handling of Acid & Toxic Materials ......... .................._.........I02(c) <br />7. Stabilization (rills and gullies) ................... . <br />...............................95(6) <br />E. Excess Spoil Disposal .............................:....:........(816/817,71-74) <br />1. Placement ................................................................ ...........................71(e) <br />2. Drainage Control ....................~,.............................. ........................... 71(f) <br />3. Surface Stabrlization ............................................... ............................7t(g) <br />4. Inspections &Certifications .................................... ...........................71(h) <br />F. Coal Mine Waste (Reruse Plles/[mpouadments) ,,,,,(g16/817.81-84) <br />I. Drainage Convol .................................................... ...........................83(a) <br />2. Surface Stabilizerion ............................................... ...........................83(6) <br />3. Placemen[ ................................................................ ...........................83(c) <br />4. Inspections and Certifications ................................. ..........................83(d) <br />5. Impounding SWctures ............................................ ...............................84 <br />G. Use of Explosives ..................................................(816/817.61-68) <br />1. Blaster Certification ................................................ ...........................61(c) <br />2. Distance Prohibitions .............................................. ...........................61(d) <br />3. Blast Survey/Schedule ............................................. ..........................62-64 <br />4. W amings & Records ............................................... .......................66 & 68 <br />5. Control of Adverse Effects ...................................... ...............................67 <br />H, Subsidence Control Plan ............................... ..........(817.121-122) <br />I. Roads ............._............................................... ...(816/817.150-151) <br />1. Road Construction ................................................... ........................I50(c) <br />2. Certification ............................................................. .........................151(a) <br />3. Drainage ................................................................... ............I50(b)-15](d) <br />4. Surfacing and Main[enance ..................................... .............150(e)-151(d) <br />5. Reclamation ............................................................. .........................t50(fl <br />J• Signs & Markers .......................................................(816/817.11) <br />1. Signs .....................................................................................Il(a),(b),&(c) <br />2. Markers ......................................................................I1(a),(b).(d),(e),&(t) <br />If. Distance Prohibitions .................................»....................(761.11) <br />L. Revegetation .....................................................(816!817.111-116) <br />1. Vegetative Cover .......................................................................111 & 116 <br />2. Timing ..................................................................................................113 <br />M. Postmining Land Use ..............................................(816/817.133) <br />Page 2 of <br />
The URL can be used to link to this page
Your browser does not support the video tag.